My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2007-061
San-Marcos
>
City Clerk
>
03 Resolutions
>
2000 s
>
2007
>
Res 2007-061
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2007 2:59:00 PM
Creation date
4/5/2007 8:31:50 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
2007-61
Date
4/3/2007
Volume Book
171
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />2.1 Provide full information to the Engineer regarding the City's requirements for the <br />Consultant's services under this Agreement. The City will furnish the Engineer with copies of <br />official City design standards and construction standards, and other data and information in the <br />City's possession needed by the Engineer at the Consultant's request. <br /> <br />2.2 Designate Laurie Anderson, Director of Environment and Engineering as the City's <br />Project Manager and authorized representative to act on the City's behalf with respect to this <br />Agreement. The City will examine the documents and information submitted by the Engineer <br />and promptly render responses to the Engineer on issues requiring a decision by the City. <br /> <br />2.3 Provide access to and make all necessary provisions for the Engineer to enter public and <br />private property as required for the Engineer to perform its services under this Agreement. <br /> <br />2.4 Be responsible for the cost of printing and binding of the bid documents. <br /> <br />2.5 Bear all costs incidental to this Article. <br /> <br />ARTICLE 3 <br />CONSTRUCTION COST <br /> <br />3.1 DEFINITION <br /> <br />3.1.1 The construction cost will be the total cost or estimated cost to the City of all elements of <br />the Project designed or specified by the Consultant. <br /> <br />3.1.2 The construction cost will include at current market rates, including a reasonable <br />allowance for overhead and profit, the cost of any equipment which has been designed, specified, <br />selected or specially provided for by the Consultant, except that used materials and equipment <br />will be included as if purchased new for the Project. <br /> <br />3.1.3 Construction cost does not include the compensation of the Engineer and the Consultant's <br />consultants, or other costs which are the responsibility of the City as provided in Article 2. <br /> <br />3.2 RESPONSIBILITY FOR CONSTRUCTION COST <br /> <br />3.2.1 Evaluations of the City's Project budget and detailed cost estimates, if any, prepared by <br />the Consultant, will represent the Consultant's best judgment as a design professional familiar <br />with the construction industry. <br /> <br />3.2.2 A fixed limit of construction cost for this Project will be established by the City's <br />representative after consulting with the Consultant. The Engineer will be permitted to include <br />contingencies for design, bidding and price escalation, to determine what materials, equipment, <br />and types of construction are to be included in the construction contract documents, to make <br /> <br />9 <br /> <br />AP AI - TXI Contract <br />
The URL can be used to link to this page
Your browser does not support the video tag.