Laserfiche WebLink
<br />1.4.15 Ensure that all notices and signs required and provided by the City are posted in the <br />appropriate locations at the Project site by the Contractor. <br /> <br />1.4.16 Participate in a walk-through with the City upon receipt of notification from the <br />construction contractor that construction is complete. In addition, the Engineer will provide <br />input to the City so that the City can prepare a punch list of items requiring corrective action by <br />the construction contractor. Following the completion of the corrective actions, the Engineer <br />will accompany representatives of the City on a final walk-through of the project. After <br />determining that the corrective actions have been completed, the Engineer will recommend <br />acceptance of the project and approval of the contractor's final payment. In addition, the <br />Engineer will send a letter to TCEQ indicating that the construction has been completed in <br />general accordance with the approved plans and specifications. <br /> <br />1.4.17 Prepare a record set of drawings based on compiled change orders and drawings of field <br />changes provided by the contractor. The Engineer will provide the City with a Certificate of <br />Completion, signed and sealed by a Professional Engineer at the conclusion of the record <br />drawing review. Record drawings will be provided in digital image format (TIFF) and hard copy <br />format. <br /> <br />1.4.18 Prior to the end of the one year warranty period, review the completed Project with the <br />City and the Contractor and have all deficient items corrected. The extent of the duties, <br />responsibilities and limitations of authority of the Engineer as the City's representative during <br />construction will not be modified or extended after the construction contract documents have <br />been authorized by the City to be competitively bid without written consent of the City and the <br />Engineer and with notice to the Contractor. <br /> <br />1.5 ADDITIONAL SERVICES/CHANGE IN SERVICES <br /> <br />1.5.1 Since the Consultant's compensation is a fixed fee for Basic Services, including minor <br />deviations from those described in this Agreement, compensation to the Engineer for Additional <br />Services will only be for substantial deviations from the scope of services described in this <br />Agreement. The Engineer will submit a written estimate of fees to the City and obtain the City's <br />authorization before initiating any additional services. <br /> <br />1.5.2 Each material change (deletion or addition) in the services to be provided by Engineer <br />must be authorized by the City on the Authorization of Change in Services form attached to this <br />Agreement as Attachment A. Compensation for additional services will be in addition to that <br />specified for Basic Services in accordance with Section 15.2 of this Agreement. The approval of <br />the City's governing body is necessary for all additional services the compensation for which <br />exceeds $25,000. <br /> <br />ARTICLE 2 <br />THE CITY'S RESPONSIBILITIES <br /> <br />The City will: <br />AP AI - TXI Contract <br /> <br />8 <br />