My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2007-061
San-Marcos
>
City Clerk
>
03 Resolutions
>
2000 s
>
2007
>
Res 2007-061
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2007 2:59:00 PM
Creation date
4/5/2007 8:31:50 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
2007-61
Date
4/3/2007
Volume Book
171
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />the issuance of a Certificate for Payment will not be a representation that the Engineer has made <br />any examination to ascertain how and for what purpose the Contractor has used the monies paid <br />by the City. <br /> <br />1.4.9 Have authority to reject work which does not conform to the construction contract <br />documents. Whenever, in the Consultant's reasonable opinion, it is necessary or advisable for <br />the proper implementation of the intent of the construction contract documents, and with the <br />approval of the City, the Engineer will have authority to require special inspection or testing of <br />the work in accordance with the provisions of the construction contract documents, whether or <br />not such work is then fabricated, installed or completed. The Engineer will review the work and <br />results of all testing laboratories as required by the construction contract documents. <br /> <br />1.4.10 Review and make all decisions regarding the approval or taking of other appropriate <br />action upon the Contractor's submittals, including but not limited to, shop drawings, product data <br />and samples, schedule of values and progress schedule. Such action will be taken with <br />reasonable promptness, but generally not to exceed 15 days or such period of time as will not <br />cause delay of the Project. <br /> <br />1.4.11 Prepare minor changes in the plans and specifications as directed by the City; and prepare <br />necessary change orders in triplicate originals for approval by the City and execution in <br />accordance with the construction contract documents. Engineer will not issue change orders not <br />previously approved in writing by City, and no course of conduct on the part of Engineer or City <br />will amend, waive or alter this provision. <br /> <br />1.4.12 Conduct professional inspections to determine the dates of substantial completion and <br />final completion for the Project, to evaluate the work for acceptable conformance with the <br />construction contract documents and in light of any subsequent tests performed as described in <br />Subsection 1.4.8 to verify that any minor deviations from the construction contract documents as <br />described in Subsection 1.4.8 have been corrected and that the reasons for any specific <br />qualifications in any and all previous certificates for payment as described in Subsection 1.4.8 <br />hereof are either no longer valid or the condition(s) and/or problem(s) have been corrected; shall <br />receive and review written warranties and related documents required by the construction <br />contract documents and assembled by the Contractor; will issue final certificates for payment or <br />take other appropriate action; and will make a written recommendation to the City regarding <br />City's acceptance of the Project. <br /> <br />1.4.13 Require the submission by the Contractor, and subcontractors performing work on the <br />Project site, of periodic wage rate payment reports and, with the City's assistance, verify <br />compliance with federal and state wage rate requirements for the Project; and notice the City of <br />any noncompliance, or of the failure by the Contractor or subcontractor's to make submissions. <br /> <br />1.4.14 Prepare, or cause to be prepared, and submit to the City a set of reproducible record <br />drawings showing significant changes in the work made during the construction phase. <br /> <br />7 <br /> <br />AP AI - TXI Contract <br />
The URL can be used to link to this page
Your browser does not support the video tag.