<br />1.2.5 Evaluate alternative alignments for the proposed pipeline considering overall length, <br />potential conflicts, ease of construction, and easement requirements. <br /> <br />1.2.6 Prepare a Technical Memorandum that includes the results of Subsections 1.2.2, 1.2.3, <br />and 1.2.4 as well as updated opinion of probable cost. <br /> <br />1.2.7 Engineer will prepare and submit a Reclaimed Water Use Notification to the Texas <br />Commission on Environmental Quality ("TCEQ") which will be consistent with the <br />requirements of30 TAC Chapter 210. <br /> <br />1.3 PHASE 2 - DESIGN SERVICES <br /> <br />The Engineer will: <br /> <br />1.3.1 Meet with the City's Project Manager periodically or as needed to update the City on the <br />progress of work. <br /> <br />1.3.2 Head the Project team and coordinate the integration of design, surveying, right of way <br />issues, traffic control, utility Engineering, permitting, and other services as previously approved. <br /> <br />1.3.3 Assist the City in the preparation of construction contract documents using City forms <br />based on the approved design development documents and any further adjustments authorized by <br />the City in the scope, quality or budget of the Project. These contract documents will include <br />detailed plans and technical specifications required for the Project to be accurately bid and <br />efficiently constructed. <br /> <br />1.3.4 Use its best professional judgment to create technical documents that comply with <br />applicable construction and development codes, local regulations and ordinances and other <br />federal and state regulations which are known or which should reasonably be known to the <br />Engineer. <br /> <br />1.3.5 Ensure that no reports, maps, or other documents produced in whole or in part under this <br />Agreement shall be the subject of an application for copyright by or on behalf of the Engineer. <br /> <br />1.3.6 Obtain approval from the City Inspector(s) of all technical plans and specifications <br />necessary for successful completion of the Project prior to allowing the construction contract to <br />be let for bid. <br /> <br />1.3.7 Obtain a field topographic survey necessary to complete the design of the proposed <br />improvements. The Engineer will base this survey on the Texas State Grid Coordinate System <br />and will have horizontal accuracy of 0.05 feet and vertical accuracy of 0.10 feet. The design <br />survey shall cover the proposed alignment with a width of 50 feet (25-feet on either side of the <br />centerline). As part of this survey, the Engineer will tie all visible topographic features, <br />including but not limited to existing property and easement corners, mail boxes, meter boxes, <br /> <br />3 <br /> <br />AP AI - TXI Contract <br />