Laserfiche WebLink
<br /> SECTION II. RELEASE INCIDENT SUMMARY <br /> Complete all appropriate blanks pertaining to the release incident for which reimbursement is being sought in this application: <br /> YES/NO For YES or NO answers. nlease circle re500DSe in the left hand column. <br /> 1. Date release occurred or discovered: 02/89 <br /> 2. Date release was reported to the 1NRCC: 02/24/89 <br /> To whom: James Bard. <br /> .YES/NO 3. Was this a cónfumed release? <br /> 4. Describe the release detection method used: Excavation wells. <br /> 5. Substance released: p.dine; 0 diesel; 0 wB* oil; 0 other: . <br /> <br /> What amount was soilled? 10..,..., uallons. <br /> 6. Imoact on: 0 soil; 0 2foundwater; 0 surface water; 0 utilities; 0 other. <br /> 7. Date corrective action be~an at the site: February 1989. <br /> 8. Corrective action billing period for which reimbursement is sougbt in this application: <br /> JULY - SEPTEMBER <br /> 1:ES.I N 0 9. Have any tanks been removed at this site? If yes: <br /> a. Date the tanks were removed: 01/91. <br /> b. Number of tanks removed: 4 <br /> XES/NO 10. Were/are there phase-separated hydrocarbons present at this site? If yes: <br /> a. Amount recovered to date: 2606 gallons. <br /> b. Amount recovered durin!! the bOOn!! oeriod of this aDolication Nn- I!allons. <br /> 1:ES/NO 11. Has any soil outside the tankpit been excavated from this site? If yes: <br /> a. Amount of soil excavated to date: 3000 cubic yards. <br /> b. Amount of soil excavated durin!! the billin2 oeriod of this anolication: cubic yards. <br /> .YES/NO 12. Has any soil from this site been treated ? If yes: <br /> a. Amount of soil treated to date: 3000 tons. <br /> b. Amount of soil treated during the billing period of this aoolication: Nnnø tons. <br /> .YES/NO 13. Has any soil been hauled to a landfill from this site? If yes: <br /> a. Amount of soil hauled to a landfill to date: 3000 toDS. <br /> b. Amount of soil hauled to a landfill dmine: the billine: oeriod of this aoolication: Nnn.. tons. <br /> 1:ES/NO 14. Have soil borings been drilled at this site? If yes: <br /> a. Number of borings drilled to date: 76 . <br /> b. Number of borin2s drilled durin!! the billiƓ oeriod of this aDolication: None <br /> 1NRCC APPUCA110N FOR REIMBURSEMENT E-Z FORM 8 <br /> 1NRCC-0230-EZ (Reviscd09-O1-9S) <br />