Laserfiche WebLink
<br /> SECTION II. RELEASE INCIDENT SUMMARY (continued) <br /> YES 1 NO For YES or NO answers. olease circle re5oonse in the left hand column. <br /> XES/NO 15. Have monitor wells been installed at this site? If yes: <br /> a. Number of monitor wells installed to date: 34 <br /> b. Number of monitor wells installed during the billing period of this application: None <br /> c. Diameter of monitor wells installed: N/A <br /> d. Deoth of monitor wells installed: N/A <br /> DSJ NO 16. Has a soil and/or groundwater remediation systems been installed at this site? <br /> a. Type of system installed: Pump-treated (2 systems) <br /> b. Date system installed: 04/92 <br /> c. System start UP date: n~ /92 <br /> YES/NO 17. Have any technical reoorts been for this site? <br /> XES/NO 18. Has a technical report been prepared and submitted to the lNRCC for the phase of work completed for the <br /> billine: oeriod of this aDolication? If Yes, comolete Section W, Technical Reoort S <br /> 19. Provide a brief summary of the activities that have been performed to date and for activities for which <br /> reimbursement is sought in this application: <br /> Sa"'Plin~ and analytical services have been on~oin~. with :wiministrative support utili7.M and eQJdpment <br /> pUIChAV!~ ktWt to minimum while ensurin~ adeQJ1ate monitorin~ <br /> YES 1lS1l 20. Have new tanks or lines been installed at this site? If yes, indicate date(s) of installation: <br /> YES 1lS1l 21. Will new tanks be installed at this site? If yes, indicate proposed date: <br /> YES 1..lS1l 22. Were the activities and costs being submitted in this claim preapproved by the lNRCC? If yes, by whom: <br /> 'INRCC APPUCATION FOR REIMBURSEMENT E-Z FORM 9 <br /> 'INRCC-0230-EZ (Revised 09-01-95) <br />