My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1998-072
San-Marcos
>
City Clerk
>
03 Resolutions
>
1990 s
>
1998
>
Res 1998-072
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2007 1:33:46 PM
Creation date
4/16/2007 11:00:49 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
1998-72
Date
4/13/1998
Volume Book
132
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> County: Hays <br /> Highway: IH 35 in San Marcos <br /> Payment Provisions <br /> The Project consists of a ramp reconfiguration at the northbound entrance and exit ramps on IH <br /> 35 ftom Center Point Road to McCarty Lane, in San Marcoso <br /> The Outside Entity's cost for the work will be based on an actual cost estimated to be <br /> $225,808.86, including construction engineering costs, design review costs, bid opening costs and <br /> indirect costs at the rate in effect for the year in which the work will be performed. This <br /> estimated cost assumed the work proposed herein would be part of a separate and larger project <br /> to reconstruct the entire Centerpoint Road interchange. The estimated cost could vary <br /> depending on the final disposition of this separate project. In any case, the final Outside entity's <br /> cost shall be the actual cost of construction for the proposed work described in this agreement. <br /> The Outside Entity will remit to the Texas Department of Transportation, upon execution of the <br /> advance funding agreement, a check made payable to the Texas Department of Transportation in <br /> the total amount of$1,500.00, to be used towards design review costs. <br /> In the event it is determined that the funding provided by the Outside Entity is insufficient to <br /> cover the State's costs for the construction of the Project, the State will notify the Outside Entity <br /> of the required additional costs. The Outside Entity will have thirty (30) days to review the cost <br /> request and, at its sole option, perform an audit, at its own expense, on the costs incurred by the <br /> State and/or the designated contractor constructing the Project. Within said thirty (30) days <br /> review period, the Outside Entity will either agree to cover said costs or notify the State of its <br /> objections thereto and/or its determination through its audit of cost discrepancies. <br /> If the Project costs are less than the estimated amount, a refund will be made by the State to the <br /> Outside Entity. A final audit will complete the project and a determination of the remaining costs <br /> made at that time. <br /> Cost Breakdown <br /> Bid Items $167,500.00 <br /> Bid Item Contingencies $ 20,100.00 <br /> Estimated TxDOT Review Costs $ 1,500.00 <br /> Estimated Letting Costs $ 2,000.00 <br /> Construction Phase Engineering & Contingencies (11 %) $ 21.021.00 <br /> Sub-Total $212,121.00 <br /> Indirect Costs (7016%) = $ 15.187.86 <br /> Total = $227,308086 <br /> Amount due with execution of Agreement $ 1,500.00 <br /> Amount due sixty (60) days prior to Bid Opening $225,808.86 <br /> Page 9 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.