My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1998-080
San-Marcos
>
City Clerk
>
03 Resolutions
>
1990 s
>
1998
>
Res 1998-080
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2007 1:41:48 PM
Creation date
4/16/2007 11:28:07 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
1998-80
Date
4/27/1998
Volume Book
132
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> 2.2 Laurie Anderson, P.E. will be the City's Project Manager and authorized <br /> representative to act on the City's behalf with respect to this Agreement. The City will <br /> examine the documents and information submitted by the Engineer and promptly render <br /> responses to the Engineer on issues requiring a decision by the City. <br /> 2.3 Provide access to and make all necessary provisions for the Engineer to enter <br /> public and private property as required for the Engineer to perform its services under this <br /> Agreement. <br /> 2.4 Provide inspection in accordance with TWDB requirements of the construction <br /> contractor's work to ensure compliance with the contract documents. The City's Public <br /> Works Department inspectors will be on site during construction to document the daily <br /> progress of the work and materials and to document deviations from the plans and <br /> specifications and report same to Engineer. <br /> 2.5 The City will bear all costs incident to this Article. <br /> ARTICLE 3 <br /> CONSTRUCTION COST <br /> 3.1 DEFINITION <br /> 3.1.1 The construction cost will be the total cost or estimated cost to the City of all <br /> elements of the Project designed or specified by the Engineer. <br /> 3.1.2 The construction cost will include at current market rates, including a reasonable <br /> allowance for overhead and profit, the cost of any equipment which has been designed, <br /> specified, selected or specially provided for by the Engineer, except that used materials <br /> and equipment will be included as if purchased new for the Project. <br /> 3.1.3 Construction cost does not include the compensation of the Engineer and the <br /> Engineer's consultants, or other costs which are the responsibility of the City as provided <br /> in Article 2. <br /> 3.2 RESPONSIBILITY FOR CONSTRUCTION COST <br /> 3.2.1 Evaluations of the City's Project budget and detailed cost estimates, if any, prepared <br /> by the Engineer, will represent the Engineer's best judgment as a design professional <br /> familiar with the construction industry. <br /> 3.2.2 A fixed limit of construction cost for this Project will be established by the City's <br /> representative after consulting with the Engineer. The Engineer will be permitted to include <br /> contingencies for design, bidding and price escalation, to determine what materials, <br /> equipment, and types of construction are to be included in the construction contract <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.