My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1998-086
San-Marcos
>
City Clerk
>
03 Resolutions
>
1990 s
>
1998
>
Res 1998-086
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2007 2:16:46 PM
Creation date
4/16/2007 11:32:59 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
1998-86
Date
4/27/1998
Volume Book
132
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> 1.5.12 Review requests by the Contractor for additional information about the Contract <br /> Documents. The Consultant will require these requests to be in a form prepared or <br /> approved by the Consultant, including a detailed written statement that indicates the <br /> specific plans or specifications in need of clarification and the nature of the clarification <br /> requested. If deemed appropriate by the Consultant, the Consultant will prepare, <br /> reproduce and distribute supplemental plans and specifications in response to requests <br /> for information by the Contractor. <br /> 1.5.13 After review of the Project, recommend design changes, additions, or corrections. <br /> Changes and additions approved by the City and corrections as necessary will be added <br /> to the work by Change Order. The Consultant will also prepare minor changes in the plans <br /> and specifications as directed by the City; and prepare necessary change orders in <br /> triplicate originals for approval by the City and execution in accordance with the <br /> construction contract documents. The Consultant will not issue change orders unless they <br /> are previously approved in writing by City, and no course of conduct on the part of <br /> Consultant or City will amend, waive or alter this provision. A contingency fund, in an <br /> amount established by the City in consultation with the Consultant, will be provided by the <br /> City to be used for these changes, additions, and corrections. <br /> 1.5.14 Review requests by the City or Contractor for changes in the work, including <br /> adjustments to the contract price or contract time. The Consultant will require these <br /> requests to be accompanied by sufficient supporting data and information to permit the <br /> Consultant to make a reasonable determination without extensive investigation or <br /> preparation of additional drawings or specifications. If the Consultant determines that <br /> requested 'changes in the work are not materially different from the requirements of the <br /> contract documents, the Consultant may issue an order for a minor change in the work or <br /> recommend to the City that the requested change be denied. If the Consultant determines <br /> that implementation of the requested change would result in a material change to the <br /> Contract that may cause an adjustment in the contract time or contract sum, the Consultant <br /> will make a recommendation to the City, who may authorize a change order to be <br /> prepared. <br /> 1.5.15 Maintain records relative to changes in the work. <br /> 1.5.16 Conduct professional inspections to determine the dates of substantial completion <br /> and final completion for the Project, to evaluate the work for acceptable conformance with <br /> the construction contract documents and in light of any subsequent tests performed as <br /> described in Subsection 1.5.9 to verify that any minor deviations from the construction <br /> contract documents as described in Subsection 1.5.9 have been corrected and that the <br /> reasons for any specific qualifications in any and all previous certificates for payment as <br /> described in Subsection 1.5.9 hereof are either no longer valid or the condition(s) and/or <br /> problem(s) have been corrected; will receive and review and forward to the City for the <br /> City's review and records, written warranties and related documents required by the <br /> construction contract documents and assembled by the Contractor; will issue final <br /> certificates for payment based upon the final inspection, or take other appropriate action; <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.