My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1998-086
San-Marcos
>
City Clerk
>
03 Resolutions
>
1990 s
>
1998
>
Res 1998-086
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2007 2:16:46 PM
Creation date
4/16/2007 11:32:59 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
1998-86
Date
4/27/1998
Volume Book
132
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> elements of the Project designed or specified by the Consultant. <br /> 3.1.2 The construction cost will include at current market rates, including a reasonable <br /> allowance for overhead and profit, the cost of any equipment which has been designed, <br /> specified, selected or specially provided for by the Consultant, except that used materials <br /> and equipment will be included as if purchased new for the Project. <br /> 3.1.3 Construction cost does not include the compensation of the Consultant and the <br /> Consultant's consultants, or other costs which are the responsibility of the City as provided <br /> in Article 2. <br /> 3.2 RESPONSIBILITY FOR CONSTRUCTION COST <br /> 3.2.1 Evaluations of the City's Project budget and detailed cost estimates, if any, prepared <br /> by the Consultant, will represent the Consultant's best judgment as a design professional <br /> familiar with the construction industry. <br /> 3.2.2 A fixed limit of construction cost for this Project will be established by the City's <br /> representative after consulting with the Consultant. The Consultant will be permitted to <br /> include contingencies for design, bidding and price escalation, to determine what materials, <br /> equipment, and types of construction are to be included in the construction contract <br /> documents, to make reasonable adjustments in the scope of the Project and to include in <br /> the construction contract documents alternate bids to adjust the construction cost to the <br /> fixed limit. The fixed limit of construction cost may be increased by the City. <br /> 3.2.3 If the lowest bona fide bid exceeds the Consultant's most recent approved cost <br /> estimate established as a condition of this Agreement, the City will (1) give written approval <br /> of an increase in such fixed limit, (2) authorize rebidding of the Project within a reasonable <br /> time, or (3) cooperate in revising the Project scope and quality to reduce the construction <br /> cost. During the development of the Project through the phases described by Article 1 of <br /> this Agreement and prior to the City's final approval of construction contract documents, <br /> the Consultant will monitor the established probable construction cost in relation to the <br /> established fixed limit. <br /> If necessary, the Consultant will implement construction cost savings measures or <br /> otherwise endeavor to limit probable construction cost to the level of available funds set <br /> by the City. <br /> ARTICLE 4 <br /> REIMBURSABLE EXPENSES. <br /> 4.1 Reimbursable expenses, including such things as expenses for plotting, <br /> reproduction of documents (except bid documents), auto travel mileage, delivery charges, <br /> long distance communications, freight, and state accessibility review are included in the <br /> Consultant's basic services compensation. Compensation for reimbursable expenses will <br /> not exceed $8,800.00 without prior written approval from the City. <br /> 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.