Laserfiche WebLink
<br /> by telephonic communication or otherwise to issue .instructions necessary for the proper <br /> progress and acceptance of work; (2) jeopardy to life and/or property exists; and/or (3) lack <br /> of instructions and/or unavailability of Consultant will result in, in City's opinion, harm to <br /> City, in which case instructions may be forwarded directly to the Contractor by the City; <br /> have authority to act on behalf of the City only to the extent provided herein and in the <br /> construction contract documents unless otherwise modified by written instrument in <br /> accordance with Section 11.1. Any instructions issued directly by City to Contractor will be <br /> promptly communicated to the Consultant if the Consultant was unavailable at the time of <br /> issuance of instructions. Communications by and with the Consultant's subconsultants will <br /> be through the Consultant. <br /> 1.5.3 Conduct a pre-construction conference with the Contractor, members of City's staff, <br /> representatives of affected utility providers, and federal and state agencies having <br /> jurisdiction over the Project (including City inspectors) in order to establish construction <br /> schedules and to identify key representatives of the parties and lines of communication. <br /> 1.5.4 Assist the City in ensuring that all documents have been filed with, and all applicable <br /> permits and approvals have been obtained from the governmental agencies having <br /> jurisdiction over the Project prior to construction, exclusive of building permits. <br /> 1.5.5 Make on-site inspections of the Project at least weekly to ensure familiarity with the <br /> progress and quality of the work, to determine if the work is proceeding in acceptable <br /> conformance with the construction contract documents, and to review the work with the <br /> City's designated representatives. On the basis of these on-site inspections by the <br /> Consultant, the Consultant will keep the City informed of the progress and quality of the <br /> work through written status reports and through meetings with the City's representative; <br /> and will also be reasonably available to perform site visitations at the specific request of <br /> the City by the next business day after a request is made. <br /> 1.5.6 Not have control or charge of and will not be responsible for construction means, <br /> methods, techniques, sequences or procedures, or for safety precautions and programs <br /> in connection with the work, for the acts or omissions of the Contractor, subcontractors or <br /> any other persons performing any of the work, or for the failure of any of them to carry out <br /> the work in accordance with the construction contract documents unless the acts or <br /> omissions are due to the negligence of the Consultant or are acts or omissions under the <br /> Consultant's control. However, Consultant will exercise its authority on behalf of City in <br /> accordance herewith and particularly during the construction phase so that all work <br /> performed by the Contractor results in a Project completed in accordance with the <br /> construction contract documents, and during any phase should the Consultant become <br /> aware of the Contractor's utilization of means, methods, techniques, sequences and/or <br /> procedures of construction which, in Consultant's opinion, will not result in completion of <br /> the Project in accordance with the construction contract documents; or which are unsafe, <br /> Consultant will immediately inform the City and will take all necessary action which the <br /> Consultant is authorized under this Agreement to take to correct the matter, including <br /> stopping work on all or part of the Project, with the City's consent. <br /> 7 <br />