Laserfiche WebLink
<br /> County: Hays <br /> CSJ: 0914-33-900 <br /> Highway: Center Point Road <br /> Payment Provisions <br />The Project consists of the reconstruction of Center Point Road ITom ill 35 to 0.25 Mile East, in <br />San Marcos, Texas. The Project will be combined with Project 0016-03-073, interchange <br />reconstruction of ill 35 and Center Point Road, in San Marcos, Texas. The apparent low bidder <br />will complete both projects in their entirety. <br />The Outside Entity's cost for the Project, will be based on an actual cost estimated to be <br />$446,200.00, which includes construction engineering and design review and coordination costs. <br />The Outside Entity will remit to the Texas Department of Transportation, upon execution of the <br />advance funding agreement, a check made payable to the Texas Department of Transportation in <br />the total amount of $3,000.00, to be applied towards the required design review and coordination <br />of the Project. <br />In the event it is determined that the funding provided by the Outside Entity is insufficient to <br />cover the State's design coordination costs for the Project, the State will notify the Outside <br />Entity. The Outside Entity will have thirty (30) days to review the additional costs request and, at <br />its sole option, perform an audit, at its own expense, on the costs incurred by the State and/or the <br />designated contractor constructing the Project. Within said thirty (30) days review period, the <br />Outside Entity will either agree to cover said costs or notify the State of its objections thereto <br />and/or its determination through its audit of cost discrepancies. <br />If the Project costs are less than the estimated amount, a refund will be made by the State to the <br />Outside Entity. A final audit will complete the project and a determination of the remaining costs <br />made at that time. <br /> Cost Breakdown <br />Bid Items & Contingencies $443,200.00 <br />Estimated TxDOT Review Costs $ 3.000.00 <br /> Total = $446,200.00 <br />Amount due with execution of Agreement $ (3.000.00) <br />Amount due sixty (60) days prior to Bid Opening $443,200.00 <br /> 9 <br />