My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1998-109
San-Marcos
>
City Clerk
>
03 Resolutions
>
1990 s
>
1998
>
Res 1998-109
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2007 4:47:49 PM
Creation date
4/16/2007 3:53:54 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
1998-109
Date
6/8/1998
Volume Book
133
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> COUNTY, : Hays <br /> CSJ : 0914-33-900 <br /> IDGHWAY : Center Point Road <br /> From IH 35 to 0.25 Mi. E. <br /> A TT ACHMENT A <br /> Payment Provision <br /> and <br /> Work Responsibilities <br />1. Environmental Mitigation <br /> A. To the extent required to complete the Project, the Outside Entity will be <br /> responsible for the mitigation and remediation of all environmental problems <br /> associated with the development and construction of the Project. The Outside <br /> Entity shall provide to the State written certification trom the appropriate <br /> regulatory agency(s) that all environmental problems have been remedied. The <br /> State will not open bids on the construction contract until all environmental <br /> problems have been remediated by the Outside Entity. <br /> B. All costs associated with the remediation of the environmental problems caused by <br /> the negligence of willful conduct of the Outside Entity and/or the property owners <br /> shall be the responsibility of the Outside Entity and/or property owners and not the <br /> State of Texas. <br /> C. The State will prepare, or cause to be prepared, the environmental assessment. <br /> This work will be combined with that of the interchange reconstruction project <br /> described under Payment Provisions. If it is determined any environmental <br /> mitigation is necessary for the Outside Entity's project, this shall be the <br /> responsibility of the Outside Entity. <br />2. Engineering Services <br /> A. The Outside Entity wilJ prepare or cause to be prepared the engineering <br /> specifications, Storm Water Pollution Prevention Plan and estimates necessary for <br /> the development of the Project. <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.