Laserfiche WebLink
<br /> CITY OF SAN MARCOS Construction ofImprovements for City's <br /> April 29, 1999 Cut and Cap Program with SWTSU <br /> Page 3 Prop. No. 99-4020R <br /> (walls over 4 feet in height); testing lab services; trench safety engineering; <br /> design surveYIng; construction staking; geotechnical investigation; <br /> environmental assessment and survey of "as-built" improvements. <br /> BASIS OF COMPENSATION <br /> We propose to provide the above-described Scope of Services on an <br /> hourly-rate basis in accordance with the attached hourly rate schedule for <br /> the not-to-exceed fees as follows: <br /> PHASE I: Design Phase ....................................... $ 9,700.00 <br /> PHASE II: Bidding Assistance Phase """"'.'.'."" $ 2,200.00 <br /> PHASE III: Construction Phase ............................ $ 3,000.00 <br /> <br /> TOTAL NOT-TO-EXCEED FEE ........................ $14,900.00 <br /> Please note the City will provide for the reproduction and copying of bid <br /> documents, including plans and project manual. We will provide the <br /> Bidding Services outlined above and assist the City as needed. <br /> Extra services which may be desired by the Client outside the above-listed <br /> Scope of Services may be provided for on an hourly-charge basis in <br /> accordance with the attached hourly rate schedule or at a mutually-agreed- <br /> to lump sum amount. <br /> If this proposal is acceptable, please provide the City agreements and we will return two <br /> (2) executed copies to your office for your files. We are prepared to commence work <br /> immediately upon your authorization. <br /> Thank you for the opportunity to submit this proposal. We appreciate your consideration <br /> of our firm in this regard and look forward to being of service to you. <br /> S~/~ <br /> Stephen A. Ramsey, P .E. <br /> SAR:ek <br /> Ene. <br /> ee: Joe Baker, BA-CP <br />