Laserfiche WebLink
(2 3) v ...... +~" ~: .... ~ .... **.~ ~ em r~, tThe applicant must pays the total cost for the <br /> <br />extension ~; .................... for a hne up to eight inches in diameter, or the line size <br />required to properly serve the use proposed by the applicant, as determined by the director of <br />water and wastewater, whichever is greater. <br /> <br />~ 4) For lines required by the city to be more than eight inches in diameter, or the line size <br />required to properly serve the use proposed by the applicant, as determined by the director of <br /> · 'lip yth ' <br />water and wastewater~ whichever is greater, the city wi ae ~.~+ ......~,.~ ~+~.~ .................. c...~ ~ t~ r^~. <br /> <br />~,u .... ,~: ..... ~ ~ ...... ~ ,~.~ ~, ~ ~ r~. ,~ ~:~, _,:. .... oversizing cost consisting of <br />the difference between the actual cost of the city-required line and the engineer's approved <br />estimated cost for ~ eight ~ch line, or the line size required to properly se~e the use proposed <br />by the applic~t, as determined by the director of water and wastewater, w~chever is greater. <br /> <br /> gi it,/ d p ........ ..~:..+ ~c ,i.~ .:+ .... <br />The extension must be n at a c -approve oint tkc ....... * v .............. ;. <br /> <br />zyst~a at which adequate capacity is available, <br /> <br /> (5 6) Any required valves, fire hydrants <br /> or appurtenances <br />must be paid for by the applicant. <br /> <br /> (~ g) The extension must be made in a public utility easement or public right-of-way, Ifa_n <br />t-he easement or right-of-way is not in place, it will be the applicant's responsibility to acquire <br />an easement i~ on behalf of the city. The form of the easement shall be subiect to approval by <br />the city, <br /> <br />(b) For wastewater extensions, the following requirements apply in addition to the <br />requirements of subsection (a): <br /> <br /> (1) The depth must be sufficient to develop the city's wastewater system in conformance <br />with the city's construction design and materials standards and the provisions of the city master <br />plan. <br /> <br />(2) Any lift station required will be financed as follows: <br /> <br />(A) The developer must pay the total cost for a system of sufficient capacity for the <br />applicant's proposed use. <br /> <br />(B) If the city determines that additional capacity is necessary, the city will pay the <br />difference between the engineer's approved estimate of the cost to install a system sufficient <br />for the applicant's proposed use and the actual cost of the system required by the city. <br /> <br /> (3) Mm~holes, cleanouts~ odor control facilities and other required zimi!ar appurtenances <br />~' ..... ~+~+~^~+ illb th p ibility fth ppli bi itv i i <br />~j .................... w e eres OhS o ea cant, su ecttoc overszng <br />participation if applicable· <br /> <br /> <br />