Laserfiche WebLink
<br /> )0 f1- <br /> EXHIBIT B PAGE 1 OF 2 <br /> CITY OF SAN MARCOS, TEXAS <br /> W ASTEW A TER RA TE--SCHEDULE US-1 <br /> (Urban Customers) <br /> Applicable: <br /> To any customer using wastewater services and being served through a single water meter, unless <br /> wastewater is separately measured, and within the corporate limits of the City. Service will be ,furnished <br /> under this rate schedule subject to the established rules and regulations of the City covering this type of <br /> servIce. <br />I <br />I Rate: <br /> US-IA:5/8-3/4 Inch Water Meter: <br /> First 2,000 gallons - $14.78 Minimum Bill. <br /> Over 2,000 gallons - $4.25 per 1,000 gallons or fraction thereof. <br /> US-IB: I-Inch Water Meter: <br /> First 4,00.0 gallons - $29.52 Minimum Bill. <br /> Over 4,000 gallons - 54.25 per 1,000 gallons or fraction thereof. <br /> US-IC: 1-1/2 Inch Water Meter: <br /> First 8,000 gallons - $59.05 Minimum Bill. <br /> Over 8,000 gallons - $4.25 per 1,000 gallons or fraction thereof. <br /> US-ID: 2-Inch Water Meter and greater: <br /> First 13,000 gallons - 594.48 Minimum Bill. . <br /> Over 13,000 gallons - $4.25 per 1,000 gallons or fraction thereof. <br /> Maximum Bill: No additional charge will be applied to a single-family Residential Customers for volumes <br /> in excess of 8,000 gallons for the US-IA, US-l B, US-I C rate categories, nor for volumes in excess of 13,000 <br /> gallons for the US-I D rate category. <br /> Single Point of Deliverv: <br />I The above rates are based upon the supply of water to the entire premises through a single delivery and <br /> metering point. A separate supply of water for the same consumer at other points of consumption shall be <br />I separately metered and billed. <br />I - <br /> Optional Methodologv for Measurement of Use bv Industrial Users: <br /> An industrial user that uses a 2-inch or larger meter may submit a written request for the use of a methodology to <br /> determine the amount of wastewater services used other than metering of water or wastewater use. The methodology <br /> must be designed to charge the user for actual wastewater service use, and is subject to approval by the Director of <br /> Public Works. rfapproved, the methodology will be used for a period of three years, subject to renewal upon <br /> submission by the user ofa renewal request accompanied by updated methodology information, and approval by the <br /> Director of Public Works. For this purpose, "industrial user" is derIDed as a manufacturing. or industrial operation. <br />