Laserfiche WebLink
<br />SECTION II. RELEASE INCIDENT SUMMARY (continued) Jf¡. <br />YES 1 NO For YES or NO answers., please circle res¡J<)nse in the left hand cŒumn. <br />YES 1 NO 15. Have monitor wells been installed at this site? If yes: <br /> a. Number of monitor wells installed to date: 34 <br /> b. Number of monitor wells installed during the billing period of this application: None <br /> c. Diameter of monitor wells installed: N/A <br /> d. Depth of monitor wells installed: N/A <br />~/NO 16. Has a soil and/or groundwater remediation systems been installed at this site? <br /> a. Type of system installed: Pump-treated (2 systems) <br /> b. Date system installed: 04/92 <br /> c. System start UP date: 05 192 <br />YES INO 17. Have any technical reports been prepared for this site? <br />YES INO 18. Has a technical report been prepared and submitted to the TNRCC for the phase of work completed for the billing <br /> period ofthis application? lfyes, complete Section ill, Technical Report SUHllll<U . <br /> 19. Provide a brief summary of the activities that have been perfonned to date and for activities for which <br /> reimbursement is sought in this application: <br /> Samplin~ and analYtical services have been on~oin~. with administrative support utilized and equipment <br /> purchases kept to minimum while ensurin~ adequate monitorino ' <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> - <br /> <br /> <br />YES 1 NO 20. Have new tanks or lines been installed at this site? If yes, indicate date(s) of installation: <br /> . <br />YES I NO 21. Will new tanks be installed at this site? If yes. indicate proposed date: <br /> <br />YES 1 NO 22. Were the activities and costs being submitted in this claim preapproved by the TNRCC? If yes, by whom: <br />TNRCC APPLICATION FOR REIMBURSEMENT E-Z FORM 8 <br />TNRCC-D230-EZ (Revised 09-D 1-95) <br />