My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1997-089
San-Marcos
>
City Clerk
>
03 Resolutions
>
1990 s
>
1997
>
Res 1997-089
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2007 3:31:36 PM
Creation date
6/11/2007 3:31:36 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
1997-89
Date
6/9/1997
Volume Book
129
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> 3,# <br />SECTION II. RELEASE INCIDENT SUMMARY <br />Complete all appropriate blanks pertaining to the release incident for which reimbursement is being sought in this application: <br /> YES 1 NO For YES or NO answers, please circle response in the left hand column. <br /> I. Date rel~se OCCUlTed or discovered: 02/89 <br /> 2. Date release was reported to the TNRCC: 02/24/89 <br /> To whom: James Bard. <br /> YES 1 NO 3. Was this a confirmed release? <br /> , <br /> 4. Describe the release detection method used: Excavation wells. <br /> 5. Substance released: X 23soline; 0 diesel; 0 waste oil; 0 other. <br /> What amount was spilled? EST 3000 oallons. <br /> 6. Impact on: 0 soil; 0 groundwater, 0 surface water; 0 utilities; 0 other. <br /> 7. Date coITective action began at the site: February 1989 <br /> 8. CoITective action billing period for which reimbursement is sought in this application: <br /> 07/011 % - 09/30 196 <br /> YES 1 NO 9. Have any tanks been removed at this site? If yes: <br /> . <br /> a. Date the tanks were removed: 01191. <br /> b. Number of tanks removed: 4 <br /> TI;S./NO 10. Were/æ:e there phase-separated hydrocarbons present at this site? If yes: <br /> a. Amount recovered to date: 2606 gallons. <br /> b. Amount recovered durin.!:!: the billing period of this application 75 . gallons. <br /> YES/NO 11. Has any soil outside the tankpit been excavated from this site? If yes: <br /> a. Amount of soil excavated to date: 3000 cubic yards. <br />- <br /> b. Amount of soil excavated during the billing period of this application: c~bic yards. <br /> YES 1 NO 12. Has any soil from this site been treated? If yes: <br /> a. Amount of soil treated to date: 3000 tons. <br /> b. Amount of soil tr~ted during the billing period of this application: None tons. <br /> YES 1 NO 13. Has any soil been hauled to a landfill from this site? If yes: <br /> a. Amount of soil hauled to a landfill to date: 3000 tons. <br /> b. Amount of soil hauled to a landfill durino the billing period of this application: None. tons. <br /> YES/NO 14. Have soil borings been drilled at this site? If yes: <br /> a. Number of borings drilled to date: 76 <br /> b. Number of borings drilled during the billing period oftbis application: None <br />TNRCC APPUCATION FOR REIMBURSEMENT E-Z FOR.\,{ 7 <br />TNRCC-D230-EZ (Revised 09-D1-95) <br />
The URL can be used to link to this page
Your browser does not support the video tag.