<br /> ]fJ <br /> A minimum of 20 minutes will be spent in locating structures in order for the access <br /> inspections to be counted for payment. A list of "could-not-Iocate" or "inaccessible" <br /> access structures will be submitted to the CITY. Once the CITY has located and <br /> provided access to these structures, ADS will complete all necessary inspections at no <br /> additional cost to the CITY prior to the completion of field activities. For structures <br /> located and access provided after completion of field services, a remobilization charge <br /> will be assessed. All new access structures located will be properly identified on City <br /> sewer atlas maps and provided to the CITY. . <br /> -~ The CITY will supply a list of manholes, identified on a map, which will not be located <br /> I <br /> or inspected by ADS. This list will be submitted prior to start up of field activities. ADS <br /> will not locate, inspect, and include in the final report these structures. Therefore, the <br /> identified structures will not be counted for payment. <br /> Visual inspections will be conducted on all incoming and outgoing pipes of the access <br /> structures inspected. This inspection will also include private service laterals that enter <br /> into the access structure. The information gathered will be recorded on standard field <br /> inspection forms. Photographic images will be taken of line segments from inside the <br /> access structure, showing cracked pipe; offset joints greater than 1 "; partially or fully <br /> collapsed pipe; or obstructions such as roots, debris, or grease. <br /> D. Smoke Testing . <br /> ADS will conduct smoke testing in Sub-basin 6 which consists of approximately 83,000 <br /> linear feet (Lf.). Testing will be accomplished by a two-person crew using a single <br /> 4,000 cfm blower and consecutive three-minute non-toxic smoke bombs. Smoke <br /> testing will be limited to not more than four line segments or 600 linear feet, whichever <br /> is less, per setup except where access dictates different setup procedures. ADS will <br /> utilize standard field forms to record all defect data. A minimum of two measurements <br /> to a stationary object will be recorded and sketched for each defect. Video will be <br /> ! taken and provided to the CITY. Photographi~ images will be taken for each defect. <br /> ADS/CITY will be jointly responsible for daily coordination with local authorities and will <br /> jointly respond to all telephone calls by building owners or occupants during all active <br /> phases of smoke testing. ADS/CITY will jointly document all follow-up meetings with <br /> property owners or occupants who reported entrance of smoke into their property. <br /> During the smoke testing phase it will be necessary to communicate with the fire <br /> department. The location of crews will be communicated to the fire department each <br /> day prior to commencing the tests. Smoke testing "Notice to Residents" will be <br /> distributed prior to testing. <br /> E. Flow Isolation <br /> In those areas determined to have possible excessive infiltration, "micro-systems" from <br /> 1,000 to 2,500 feet will be delineated. Infiltration will then be measured at micro- <br /> G: \0 AL LAS\CO NTRA C lìS MAR C b6. DOC April 11. 1997 <br />