Laserfiche WebLink
<br /> EXHIBIT B PAGE 1 OF 2 <br /> CITY OF SAN MARCOS, TEXAS <br /> WASTEWATERRATE--SCHEDULE US-I <br /> (Urban Customers) <br /> Applicable: <br /> <br /> To any customer using wastewater services and being served through a single water meter, unless <br /> wastewater is separately measured, and within the corporate limits of the City. Service will be furnished <br /> under this rate schedule subject to the established rules and regulations of the City covering this type of <br /> service. <br /> Rate: <br /> US-IA:5/8-3/4 Inch Water Meter: <br /> First 2,000 gallons - $16.12 Minimum Bill. <br /> Over 2,000 gallons - $4.64 per 1,000 gallons or fraction thereof. <br /> US-lB: I-Inch Water Meter: <br /> First 4,000 gallons - $32.19 Minimum Bill. <br /> Over 4,000 gallons - $4.64 per 1,000 gallons or fraction thereof. <br /> US-IC: 1-1/2 Inch Water Meter: <br /> First 8,000 gallons - $64.37 Minimum Bill. <br /> Over 8,000 gallons - $4.64 per 1,000 gallons or fraction thereof. <br /> US-1D: 2-lnch Water Meter and greater: <br /> First 13,000 gallons - $103.00 Minimum Bill. <br /> Over 13,000 gallons - $4.64 per 1,000 gallons or fraction thereof. <br /> Maximum Bill: No additional charge will be applied to a single-family Residential Customers for volumes <br /> in excess of 8,000 gallons for the US-lA, US-lB, US-I C rate categories, nor for volumes in excess of 13,000 <br /> gallons for the US-1D rate category. <br /> Single Point of Delivery: <br /> The above rates are based upon the supply of water to the entire premises through a single delivery and <br /> metering point. A separate supply of water for the same consumer at other points of consumption shall be <br /> separately metered and billed. <br /> Optional Methodology for Measurement of Use by Industrial Users: <br /> An industrial user that uses a 2-inch or larger meter may submit a written request for the use of a methodology to <br /> determine the amount of wastewater services used other than metering of water or wastewater use. The methodology <br /> must be designed to charge the user for actual wastewater service use, and is subject to approval by the Director of Public <br /> Works. If approved, the methodology will be used for a period of three years, subject to renewal upon submi~sion by the <br /> user of a renewal request accompanied by updated methodology information, and approval by the Director of Public <br /> Works. For this purpose, "industrial user" is defmed as a manufacturing or industrial operation. <br />