Laserfiche WebLink
<br /> EXHIBIT B PAGE 2 OF 2 <br /> CITY OF SAN MARCOS, TEXAS <br /> W ASTEW A TER RA TE--SCHEDULE US-1 <br /> (Rural Customers) <br /> Applicable: <br /> <br /> To any customer using wastewater services and being served through a single water meter, unless <br /> wastewater is separately measured, and within the corporate limits of the City. Service will be furnished <br /> under this rate schedule subject to the established rules and regulations of the City covering this type of <br /> servIce. <br /> Rate: <br /> RS-1A:5/8-3/4 Inch Water Meter: <br /> First 2,000 gallons - $20.13 Minimum Bill. <br /> Over 2,000 gallons - $5.80 per 1,000 gallons or fraction thereof. <br /> RS-1B: I-Inch Water Meter: <br /> First 4,000 gallons - $40.25 Minimum Bill. <br /> Over 4,000 gallons - $5.80 per 1,000 gallons or fraction thereof. <br /> RS-1C: 1-1/2 Inch Water Meter: <br /> First 8,000 gallons - $80.46 Minimum Bill. <br /> Over 8,000 gallons - $5.80 per 1,000 gallons or fraction thereof. <br /> RS-1D: 2-lnch Water Meter and greater: <br /> First 13,000 gallons - $128.75 Minimum Bill. <br /> Over 13,000 gallons - $5.80 per 1,000 gallons or fraction thereof. <br /> Maximum Bill: No additional charge will be applied to a single-family Residential Customers for volumes <br /> in excess of 8,000 gallons for the RS-IA, RS-lB, RS-1C rate categories, nor for volumes in excess of 13,000 <br /> gallons for the RS-1D rate category. <br /> Single Point of Delivery: <br /> The above rates are based upon the supply of water to the entire premises through a single delivery and <br /> metering point. A separate supply of water for the same êonsumer at other points of consumption shall be <br /> separately metered and billed. <br /> Optional Methodolo~y for Measurement of Use by Industrial Users: <br /> An industrial user that uses a 2-inch or larger meter may submit a written request for the use of a methodology to <br /> detennine the amount of wastewater services used other than metering of water or wastewater use. The methodology <br /> must be designed to charge the user for actual wastewater service use, and is subject to approval by the Director of Public <br /> Works. If approved, the methodology will be used for a period of three years, subject to renewal upon submission by the <br /> user of a renewal request accompanied by updated methodology infonnation, and approval by the Director of Public <br /> Works. For this purpose, "industrial user" is derIDed as a manufacturing or industrial operation. <br />