My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1996-012
San-Marcos
>
City Clerk
>
03 Resolutions
>
1990 s
>
1996
>
Res 1996-012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2007 12:44:40 PM
Creation date
6/13/2007 12:44:40 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
1996-12
Date
1/22/1996
Volume Book
122
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> ¡" <br /> Attachment A to Contract for Engineering SefYices <br /> 1) Prepare and submit to Owner and CM for review a draft of the facility <br /> Operations and Maintenance Manuat which will include a description of <br /> the facilities and recommendations for operation. The following topics <br /> will be included: <br /> a. Introduction. Brief statement of manual purpose; description of unit <br /> processes and flow path; summary of permits and standards which <br /> must be met; table of design criteria. <br /> b. Operations Considerations. Discussion of operational theory, control <br /> variables, process control and process efficiency for the treatment <br /> facilities. <br /> c. Facilities Description. Operation and Control of Facilities. Discussion <br /> of the operation and purpose of each unit treahnent process. <br /> d. Description and Operation of the Auxiliary Facilities. Discussion of <br /> auxiliary systems, including odor control, air systems, flow <br /> measurement devices, and water seal systems. <br /> e. Utilities. Descriptions and operational considerations for site <br /> utilities, including potable and nonpotable water; basin and channel <br /> drain system; and other systems. ' <br /> f. Electrical System. Detailed description of the electrical system from <br /> the main substation to the facility's individual motor control centers. <br /> 0" Maintenance. Nameplate data for each major piece of equipment, <br /> O' <br /> list of the manufacturer's recommended spare parts, and schedule of <br /> equipment manufacturer's preventative maintenance activities. <br /> h. Appendices. A glossary of treatment terms and appreciations used <br /> pertinent to this facility. <br /> 2) Following Owner's and CM's review, make any necessary modifications <br /> and submit - copies of final manual. <br /> 8.2 Startup and Personnel Training <br /> 1) Develop and conduct a one-week pre-startup training program for plant <br /> supervisors, operators, maintenance, and laboratory personnel. It is <br /> anticipated that pre-startup training will consist of a total of 15 hours of <br /> classroom work, supplemented by onsite "hands-on" training for <br /> individuals and groups. <br /> 2) Consult with Owner on training needs for post-startup operation and <br /> prepare a schedule. It is anticipated that post-startup training will be <br /> conducted for one week involving a total of 15 hours of classroom work. <br /> A2218RPT.ATT COM Camp Dresser & McKee A-11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.