My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1996-012
San-Marcos
>
City Clerk
>
03 Resolutions
>
1990 s
>
1996
>
Res 1996-012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2007 12:44:40 PM
Creation date
6/13/2007 12:44:40 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
1996-12
Date
1/22/1996
Volume Book
122
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> 3tu. <br /> Attachment A to Contract for Engineering Services <br /> 3) Provide 54 hours of onsite operation consultation, including a total of 4 <br /> hips to the site to consult on starting and optimizing biologicat chemic at <br /> and other process controls. Establish operating procedures for individual <br /> unit processes and for overall operation of the sludge processing facilities. <br /> 4) Consult with Owner's personnel concerning a computerized maintenance <br /> management system. Provide 40 hours of onsite consult'ation, including a <br /> total of 2 trips to the site. <br /> 5) Provide 64 hours of office consulting concerning the correction of items <br /> relating to the operations. Advise Owner and CM regarding correction of <br /> operational problems. <br /> 8.3 Performance Certification <br /> 1) After all facilities have been placed into service, prepare and submit to <br /> Owner and CÌVl a written report summarizing observations made during <br /> startup of the facility, the operational status of all equipment and <br /> systems, any known deficiencies that affect operations or maintenance of <br /> the facilities, any continuing operation or performance problems with the <br /> new facilities, and any recommended changes to current operational <br /> procedures or guidelines. All available operatior¡. and performance <br /> morútoring data will be included and used to support any conclusions or <br /> recommendations. <br /> 2) Provide 65 hours of office time and 96 hours of onsite time, including 4 . <br /> trips to the site, to consult concerning the correction of items relating to <br /> the operations which the Contractor has not completed. Advise Owner <br /> and CM regarding corrections of deficiencies. <br /> 3) At the end of a one year period following initial startup of the new <br /> facilities, inspect the treatm~nt facilities and compile a summary of <br /> operation and maintenance records and performance data for facilities. <br /> The data will be used to prepare an analysis of the condition and <br /> compare the performance of the facilities during the first year of <br /> operation with expected performance and NPDES Discharger Permit <br /> limitations. A report will be prepared and submitted to Owner and CM <br /> to summarize the findings and conclusions developed from the <br /> inspections and analysis. A certification statement will be.prepared <br /> stating whether or not the facilities have or are capable of achieving <br /> expected performance. <br /> A221SRPT.ATT COM Camp Dresser & McKee A-12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.