Laserfiche WebLink
<br /> , 2/l- <br /> - <br /> REVISED 6/7/96 <br />XI ITEl-IIZED BUDGET (W:i.th out/Street J.:i.ghts) <br /> TRAIL SYSTEM <br /> H:i.ke and B:i.ke Tra:i.J.s $ 92,000 <br /> Tra:i.J. park:i.ng F:i.J.trat:i.on /Detent:i.on 32,000 <br /> pedestr:i.an Br:i.dges <br /> Br:i.dge 1. 1.5,400 <br /> Br:i.dge 2 1.2,200 <br /> Landscape/Xer:i.scape Gardens 1.75,000 <br /> S:i.gnage 5,000 <br /> L:i.ght:i.ng (Tra:i.J.s) 1.50,000 <br /> SUB-TOTAL $ 48~, 600 <br /> DOWNTOWN LINKS <br />Proposed down.town. improvements inc~ude: { <br />~. the replacement or existing sidewalks with sidewalks or <br /> concrete with brick accent bands. <br />2. Limited lighting improvements. <br />3. All improvements required in accordance with ADA. <br />4. Limited landscape improvements including trees, grates and <br /> drip irrigation (San Antonio St:. only) <br />5. Addit:.ion or landscape islands at the end or each block to <br /> racilitat:.e handicapped accessibility <br />6. Restriping or parking spaces t:.o include handicapped parking <br /> as required on each block. <br />7. Lighting improvements including t:.1J.e replacement or wooden post:. <br /> with cast iron ornament:.al pedest:.rian lighting <br /> , <br />Historic Courthouse Square E. Hopkins St:.(200 &: 300 blk) <br /> sideWd~k Concrete Work 82,000 Sièewa~k Concrete work 56,000 <br /> ."fdsonry 41,000 MdSO:::ry 20,000 <br /> L~~dsCdping/Irrigation 20,000 Ldnèscaping/Irrigdtion 5,000 <br /> Sig-o...age 1,000 Sig-o...dge 555 <br /> E:lectrical 33,250 Electrical 9,000 <br /> wdterproofing/sealants 3,000 <br /> waterproo£ing/sealdnts 5,000 <br />Sub-total $177,250 S::.b-to:al $93,555 <br />