Laserfiche WebLink
<br /> 6zð <br /> - <br />N. LBJ Street (200 £: 300 B~k) <br /> Sidew~lk concrece work 67,400 <br /> Maso.c;y 33,944 <br /> Landsc~ping/irrigatio.c 1.5,200 <br /> Signage 800 <br /> El.eccrical 26,000 <br /> wate:proo£iDg/seal~nts 5,000 <br />Sub-tocal. $1.48,344 <br />Tota~ estimated construction costs $900,749 <br /> ~ <br />