My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2003-120
San-Marcos
>
City Clerk
>
03 Resolutions
>
2000 s
>
2003
>
Res 2003-120
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2004 2:32:37 PM
Creation date
10/17/2003 8:39:14 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
2003-120
Date
7/14/2003
Volume Book
152
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1.14.16 Have authority to reject work which does not conform to the construction contract <br />documents. Whenever, in the Engineer's reasonable opinion, it is necessary or advisable for the <br />proper implementation of the intent of the construction contract documents, and with the approval <br />of the City, the Engineer will have authority to require special inspection or testing of the work in <br />accordance with the provisions of the construction contract documents, whether or not such work <br />is then fabricated, installed or completed. The Engineer will review the work and results of all <br />testing laboratories as required by the construction contract documents. <br /> <br />1.14.17 Review and make all decisions regarding the approval or taking of other appropriate action <br />upon the Contractor's submittals, including but not limited to, shop drawings, product data and <br />samples, schedule of values and progress schedule. Such action will be taken with reasonable <br />promptness, but generally not to exceed 15 days or such period of time as will not cause delay of the <br />Project. <br /> <br />1. l 4.18 Prepare minor changes in the plans and specifications as directed by the City; m~d prepare <br />necessary change orders in triplicate originals for approval by the City and execution in accordance <br />with the construction contract documents. Engineer will not issue change orders not previously <br />approved in writing by City, and no course of conduct on the part of Engineer or City will amend, <br />waive or alter this provision. <br /> <br />1.14.19 Conduct professional inspections to determine the dates of substantial completion and final <br />completion for the Project, to evaluate the work for acceptable conformance with the construction <br />contract documents and in light of any subsequent tests performed as described in Subsection I. 14.15 <br />to verify that any minor deviations fi'om the construction contract documents as described in <br />Subsection 1.14.15 have been corrected and that the reasons for any specific qualifications in any <br />and all previous certificates for payment as described in Subsection 1.4.15 hereof are either no longer <br />valid or the condition(s) and/or problem(s) have been corrected; shall receive and review written <br />warranties and related documents required by the construction contract documents and assembled <br />by the Contractor; will issue final certificates for payment or take other appropriate action; and will <br />make a written reconu,nendation to the City regarding City's acceptance of the Project. <br /> <br />1.14.20 Require the submission by the Contractor, and subco~!tractors performing work on the <br />Project site, of periodic wage rate payment reports and, with the City's assistance, verify compliance <br />with federal and state wage rate requirements for the Project; and notice the City of any <br />noncompliance, or of the failure by the Contractor or subcontractor's to make submissions. <br /> <br />1.14.21 Prepare, or cause to be prepared, and submit to the City a set of reproducible record drawings <br />showing significant changes in the work made during the construction phase. <br /> <br />1.14.22 Ensure that all notices and signs required and provided by the City are posted in the <br />appropriate locations at the Project site by the Contractor. <br /> <br />1.14.23 Conduct final inspection with the City and prepare a punch list prior to final acceptance by <br /> <br />CH2M Hill. 2.wpd 12 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.