My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2003-120
San-Marcos
>
City Clerk
>
03 Resolutions
>
2000 s
>
2003
>
Res 2003-120
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2004 2:32:37 PM
Creation date
10/17/2003 8:39:14 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
2003-120
Date
7/14/2003
Volume Book
152
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
the City. <br /> <br />1.14.24 Prior to the end of the one year warranty period, review the completed Project with the City <br />and the Contractor and have all deficient items corrected. The extent of the duties, responsibilities <br />and limitations of authority of the Engineer as the City's representative during construction will not <br />be modified or extended after the construction contract documents have been authorized by the City <br />to be competitively bid without written consent of the City and the Engineer and with notice to the <br />Contractor. <br /> <br />1.15 ADDITIONAL SERVICES <br /> <br />1.15.1 Since the Engineer's compensation is a fixed fee for Basic Services, including minor <br />deviations from those described in this Agreement, compensation to the Engineer for additional <br />services will only be for substantial deviations from the scope of services described in this <br />Agreement. The Engineer will submit a written estimate of fees to the City and obtain the City's <br />authorization before initiating any additional services. <br /> <br />1.15.2 Each material change (deletion or addition) in the services to be provided by Engineer must <br />be authorized by the City on the Authorization of Change in Services form attached to this <br />Agreement as Attactmaent A. Compensation for additional services will be in addition to that <br />specified for Basic Services in accordance with Section 14.2 of this Agreement. The approval of the <br />City's governing body is necessary for all additional services the compensation for which exceeds <br />$25,000. <br /> <br /> ARTICLE 2 <br />THE CITY'S RESPONSIBILITIES <br /> <br />The City will: <br /> <br />2.1 Provide full information to the Engineer regm'ding the City's requirements for the Engineer's <br />services under this Agreement. The City will furnish the Engineer with copies of official City design <br />standards and construction stm~dards, and other data and information in the City' s possession needed <br />by the Engineer at the Engineer's request. <br /> <br />2.2 Designate Laurie Anderson, Director of Enviro~rnent and Engineering as the City's Project <br />Manager and authorized representative to act on the City's behalf with respect to this Agreement. <br />The City will examine the documents and information submitted by the Engineer and promptly <br />render responses to the Engineer on issues requiring a decision by the City. <br /> <br />2.3 Provide access to and make all necessary provisions for the Engineer to enter public and private <br />property as required for the Engineer to perform its services under this Agreement. <br /> <br />2.4 Bear all costs incident to this Article. <br /> <br />CH2M Hill. 2.wpd ] 3 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.