My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1996-124
San-Marcos
>
City Clerk
>
03 Resolutions
>
1990 s
>
1996
>
Res 1996-124
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2008 11:35:46 AM
Creation date
6/14/2007 3:04:12 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
1996-124
Date
7/22/1996
Volume Book
125
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> ~~ <br /> The initial four sites will include one site upstream af Cummings Dam in the lake pool. A site <br /> recommendation will be made based on land availability, site access, raw water pipeline routing <br /> considerations, power availability, water quality, and cost to develop the site. <br /> 1.2.13 Evaluate pump station layout alternatives and types of pumps and develop a <br /> recommended pump station layout. Develop a site master plan. <br /> 1.2.14 Address permits for any stream or highway crossings early to insure these. do not create <br /> a delay as well as any archeological or environmental factors that could affect the site. <br /> ,- <br /> ¡ 1.2.15 Prepare and submit a Draft Technical Memorandum for CITY and Project Manager <br /> Review, and a Final Technical Memorandum describing the findings and recommendations. <br /> 1.2.16 If the CITY should decide to withdraw water from either Canyon lake or the Guadalupe <br /> River, the scope of this task will be renegotiated. <br /> Evaluate Water Treatment Plant Site <br /> Three sites on the southeast side of San Marcos near the San Marcos River were evaluated in <br /> the HDR Surface Water Supply Study with the recommended site being on the south side of SH <br /> 621, east of San Marcos High School. Prior to the CITY purchasing the site the ENGINEER will: <br /> 1.2.17 Coordinate preliminary geotechnical investigations of the site with the CITY's geotechnical <br /> consultant to determine the suitability of the subsurface materials for structural foundations and <br /> to determine the presence of groundwater. <br /> 1.2.18 Provide an economic evaluation of the additional access road cost versus value of the <br /> frontage property. Because the recommended site fronts FM 621, it may be desirable to locate <br /> the plant site some distance off the highway to enable the highway frontage to be developed. <br /> 1.2.19 Using available property information from the Hays County Appraisal District provided <br /> by the CITY, make a recommendation on property size and configuration for the water treatment <br /> plant. <br /> 1.2.20 Prepare and submit a Draft Technical Memorandum for CITY and Project Manager <br /> review, and a Final Technical Memorandum describing the results of this evaluation. <br /> Evaluate Raw Water Terminal Storage Reservoir <br /> 1.2.21 Evaluate the raw water terminal storage reservoir located on the water treatment plant <br /> site to determine the advantages and disadvantages of various alternative concepts. Evaluate <br /> various sizes of storage reservoir volume based on maintaining maximum treatment plant <br /> capacity during anticipated low flow periods in the San Marcos River. USGS and/or TNRCC <br /> stream gauge flow records will be utilized. The location and layout of the proposed reservoir will <br /> be identified and analyzed. Environmental, archeological, land constraint, and other factors <br /> affecting the location of the storage reservoir will be evaluated. Soil borings and investigations <br /> will be coordinated with the CITY's geotechnical consultant. <br /> 1.2.22 Prepare and submit a Draft Technical Memorandum for CITY and Project Manager <br /> review, and a Final Technical Memorandum describing the results of the evaluation. <br /> Page 4 <br /> co ntra ctlmsclsanmarco/6000 1 CO/agreement <br />
The URL can be used to link to this page
Your browser does not support the video tag.