My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1996-125
San-Marcos
>
City Clerk
>
03 Resolutions
>
1990 s
>
1996
>
Res 1996-125
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2007 3:06:47 PM
Creation date
6/14/2007 3:06:47 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
1996-125
Date
7/22/1996
Volume Book
125
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> -¿~r <br /> d. Procedures Manuals and Training Session. Program Manager will <br /> provide thorough user instruction in the form of a manual for the <br /> model, supplying adequate documentation for subsequent use of <br /> the model by Owner staff. An on-site one-day training session will <br /> be conducted by Program Manager to familiarize Owner's staff in <br /> the operation of the computer rate model. <br /> 7. Reports and Meetings <br /> -- <br /> I Program Manager considers communication with the Owner to be <br /> essential during all aspects of the study and proposes the following: <br /> a. Attend one meeting with the Owner's representative at the start of <br /> the study to obtain data, information, and policy direction for the <br /> proposed study. <br /> b. Attend one meeting at the conclusion of the revenue requirements <br /> development portion of the study to discuss capital improvements <br /> financing and to obtain Owner staff comments and policy <br /> direction on the timing and need for revenue/rate increases. <br /> ~ <br /> c. Attend one meeting at the conclusion of the cost allocation and <br /> rate design process with Owner representatives to obtain input <br /> into final rate recommendations. <br /> d. Attend one meeting to present and discuss final study results with <br /> the Owner's City Council. <br /> e. Attend a training session to instruct the Owner's staff in the use of <br /> : the rate model software package. <br /> ! <br /> ! <br /> , <br /> I Provide to the Owner adequate draft copies of a preliminary report <br /> f. <br /> incorporating the findings of all facets of the studies. <br /> g. Based upon review comments received on the draft report, make <br /> modifications as necessary and provide adequate copies of the <br /> final report incorporating the findings of all facets of the studies. <br /> G. Preconstruction Services for each contract (based on one construction <br /> contract and one equipment prepurchase contract). <br /> A-10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.