Laserfiche WebLink
<br /> ¿8'l1 <br /> 1. Constructability Review. Perform a constructability review of the <br /> construction contract documents provided by Owner and Design <br /> Engineer, including: <br /> . Standard front-end documents of the Owner. <br /> . Supplementary Conditions. <br /> I . Specific scheduling and reporting requirements of the contractor. <br /> . Requirements for coordination with other contractors and <br /> administrative procedures not covered by Supplementary <br /> Conditions. <br /> . Construction Management provisions in applicable sections of <br /> .' contract and bid documents and specifications. <br /> . Geotechnical design summary report. <br /> . Geotechnical data report. <br /> Plans and Technical Specifications. .. <br /> . <br /> . Unforeseen Condition Provisions. <br /> . Change Order Payment and Time Extension Provisions, including <br /> standby charges. <br /> . Bid Form. <br /> f <br /> I . Prebid and Preaward Conference Activities. <br /> . Risk allocation between Owner and contractor. <br /> . Roles of Program Manager, and design engineer, including <br /> subcontractors. <br /> . Dispute resolution provisions. <br /> 2. Contract Change Order Procedures. Incorporate effective contract <br /> change order procedures into the Construction Contract that will <br /> provide for the following: <br /> A-11 <br />