Laserfiche WebLink
<br /> Z$ß <br /> necessary at any time for the Project, including "5uch auditing services as the CITY may <br /> require to ascertain how or for what purposes the Contractor used the money paid by or <br /> on behalf of the CITY. <br /> 2.6 Subject to the PROGRAM MANAGER's obligations regarding permit applications <br /> as described in Attachment A to this Agreement, furnish approvals and permits from all <br /> governmental authorities having jurisdiction over the Construction Projects and such <br /> approvals and consents from others as is necessary for completion of the Construction <br /> -- Projects. <br /> 2.7 Pay all costs incident to obtaining bids from Contractors (e.g., legal notice <br /> requirements and the provision of the City facilities for pre-bid and pre-construction <br /> conferences). <br /> 2.8 Pay all fees for filing and processing permits and other governmental approvals. <br /> .- , <br /> 2.9 Bear all costs incident to this Article. <br /> 2.10 Issue written notices authorizing the PROGRAM MANAGER to proceed with the <br /> work specified in each of the phases of Basic Services included in this Agreement. <br /> 2.11 Provide the CITY's standard construction contract and equipment procurement <br /> documents, which do not include plans or technical specifications, to the PROGRAM <br /> MANAGER. <br /> 2.12 Conduct or arrange to have conducted all subsurface investigations, including but <br /> not limited to borings, test pits, soil resistivity surveys, and other subsurface explorations, <br /> and make or arrange to have made the interpretations of data and reports resulting from <br /> such investigations. <br /> 2.13 Perform all geotechnical services and all survey services. <br /> - 2.14 Retain a Design Engineer for each Construction Project. <br /> 2.15 Communicate with the Construction Contractors through the PROGRAM <br /> MANAGER. <br /> 2.16 Attend the pre-bid conferences, bid openings, preconstruction conferences, <br /> construction progress and other job related meetings and substantial completion <br /> inspections and final payment inspections. <br /> 2.17 Notify the PROGRAM MANAGER of any developments that affect the scope or <br /> timing of PROGRAM MANAGER's services, and notify the PROGRAM MANAGER of <br /> defects or non-conformance of the work of a Construction Contractor. <br /> 3 <br />