<br /> Z8 C-- <br /> 2.18 Coordinate with the PROGRAM MANAGER to ensure that all agreements between <br /> the CI1Y and the Design Engineers and the Construction Contractors are compatible and <br /> consistent with this Agreement. PROGRAM MANAGER will be listed as an additional <br /> insured in the construction contract. <br /> 2.19 In order for the PROGRAM MANAGER's project team to conduct the water rate <br /> studies and model development in a timely manner, furnish required basic data and <br /> information for the water utility, including the following items: . <br /> r a. All audited financial statements and other records of the water utility's <br /> I <br /> I financial operations; operational statistics, facility inventories, <br /> ò, <br /> descriptions and maps, reports of other consultants, available records <br /> of water sales, and such other data as may be available and which <br /> may be useful in the studies outlined. <br /> b. ,". A tabulation of customers' bills reflecting the number of bills rendered, <br /> and the sales volumes billed for water service during a recent 12- <br /> month period. Direction for these tabulations will be provided by <br /> PROGRAM MANAGER. <br /> c. A schedule of major capital improvements to the water system <br /> anticipated during the study period, including general descriptions of <br /> each item of improvement, estimated construction costs, and <br /> anticipated dates of construction. PROGRAM MANAGER will assist <br /> in preparing the capital improvement program. <br /> d. Policy direction on such matters as the Owner considers appropriate, <br /> and expeditious review of preliminary findings and reports to permit <br /> the timely completion of the study. <br /> ! <br /> i <br /> i ARTICLE 3 <br /> CONSTRUCTION COST <br /> 3.1 DEFINITION <br /> 3.1.1 The construction cost for each Construction Project will be the total cost or <br /> estimated cost to the CI1Y of all elements of the Construction Project designed or specified <br /> by the Design Engineer. ' <br /> 3.1.2 The construction cost will include at current market rates, including a reasonable <br /> allowance for overhead and profit, the cost of any equipment which has been designed, <br /> specified, selected or specially provided for by the Design Engineer, except that used <br /> materials and equipment will be included as if purchased new for the Construction Project. <br /> 4 <br />