My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1996-129
San-Marcos
>
City Clerk
>
03 Resolutions
>
1990 s
>
1996
>
Res 1996-129
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2007 9:53:23 AM
Creation date
6/15/2007 9:53:23 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
1996-129
Date
8/12/1996
Volume Book
125
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> GZfJ <br /> ATTACHMENT A <br /> ADS SCOPE OF WORK <br /> CITY OF SAN MARCOS <br /> Phase I <br /> -- A. Mobilization and Project Administration <br /> Upon receipt of a Notice to Proceed, ADS will schedule field personnel, mobilize the <br /> project team and arrange for a formal project kick-off meeting to be held within 10 days <br /> of the Notice to Proceed with the CITY's staff, establishing the lines of communication <br /> and providing input regarding historical information as it relates to the current project <br /> scope. A project schedule will be submitted for review and approval by the CITY at the <br /> kick-off meeting": "Preliminary information to be obtained from the CITY may include, but <br /> not be limited to, reports of previous studies, collection system maps, and historical <br /> water usage and treatment plant records. Previous reports will be reviewed to provide <br /> a better understanding of historical conditions in the wastewater collection system. <br /> General Administration <br /> . <br /> General administration will include development of internal filing systems for incoming <br /> field data including flow monitoring data, smoke testing results, etc. ADS will provide a <br /> copy of the filing system to the CITY. Monthly project update meetings with the CITY <br /> will be conducted so that the project schedules and budgets are properly tracked and <br /> maintained. <br /> ADS anticipates coordinating the activities of this project and any follow-on results with <br /> other programs currently being undertaken by the CITY. Specifically, the integration of <br /> the City's GIS and management software pro.grams will be considered. Additional <br /> efforts will be dedicated to working with the Operations and Maintenance staff to <br /> facilitate the most cost-efficient solutions to identified problems. Additional Engineering <br /> hours have been estimated for these coordinating efforts and have been included in the <br /> lump sum items in line items 2. and 8. in Phase I on Attachment B. <br /> Project Review and Quality Assurance Program <br /> As part of a quality assurance program, flow monitoring data will be verified through the <br /> use of insitu field hydraulic calibrations using independent equipment. Velocity profiles <br /> of each flow monitoring location will be undertaken to verify site hydraulics. During the <br /> course of the project, data collected by the flow meters will be compared to manual <br /> readings taken by ADS personnel at each site. Both a graphical and tabular review of <br /> the data will be performed. <br /> G:\DAlLAS\C 0 NTRACiìSAN MA R C. DOC June 25, 1996 <br />
The URL can be used to link to this page
Your browser does not support the video tag.