Laserfiche WebLink
<br /> 6zI- <br /> During the field investigations of this project tFaffic control for the public safety will be <br /> maintained. The disruption of traffic will be minimized. ADS will abide by the traffic <br /> control procedures outlined in the ADS Field Safety Manual. However, these <br /> guidelines will not override local or state traffic control regulations. Two copies of this <br /> manual will be provided to the CITY. <br /> B. Above Ground Reconnaissance! Map Update <br /> This data will supply background base data to be used during the collection system <br /> analysis. Above ground physical inspection is to be performed to determine the <br /> physical condition, location and length of the sewer system, to identify covered <br /> manholes, and to verify and update the sanitary sewer collection system map. The <br /> following data to be recorded is to include, but not be limited to: <br /> - Length between manholes <br /> - Identification of each manhole in accordance with the Black and Veatch <br /> established criteria <br /> - Identification of covered or unlocated manholes <br /> - Identification of visible sources of extraneous flow <br /> - Notation of unusual conditions that may require immediate attention <br /> - Confirmation of flow direction <br /> . <br /> C. Manhole InspectionNisual Pipe Inspection <br /> Internal inspections of 100% of all sanitary access structures within the project will be <br /> conducted. Industry standard OSHA, NIOSH, OSDA and NASSCO confined space <br /> entry policies and practices will be followed to ensure safe entry and egress of all <br /> access structures. In the event of conflicting requirements, OSHA standards will <br /> prevail. Photographic images will be taken of selected defects indicating the general <br /> surroundings of each manhole. All manhole components (i.e., cover, frame, frame seal, <br /> chimney, corbel, wall, etc.) will be inspected and recorded on standard field inspection <br /> forms. Pipe diameter measurements will be rounded to the nearest industry standard <br /> pipe diameter (i.eo, a measurement of 7.75" will be recorded as 8.0"). The rim-to-invert <br /> measurements, in tenths of feet, and general orientation for all connecting lines will be <br /> recorded. <br /> A minimum of 20 minutes will be spent in locating structures in order for the access <br /> inspections to be counted for payment. A list of "could-not-Iocate" or "inàccessible" <br /> access structures will be submitted to the CITY. Once the CITY has located and <br /> provided access to these structures, ADS will complete all necessary inspections at no <br /> additional cost to the CITY prior to the completion of field activities. F or structures <br /> located and access provided after completion of field services, a remobilization charge <br /> will be assessed. All new access structures located will be properly identified on City <br /> sewer atlas maps and provided to the CITY. <br /> G:\OA LLAS\C aNTRA CT\SA NMAR CoDOC June 25, 1996 <br />