<br /> ¿IC <br /> .7 íL-- <br /> appropriate action upon the Contractor's submittals, including but not limited to, shop <br /> drawings, product data and samples, schedule of values and progress schedule. Such <br /> action will be taken with reasonable promptness, but generally not to exceed 15 days or <br /> such period of time as will not cause delay of the Project. <br /> 1.3.12 Prepare minor changes in the plans and specifications as directed by the City; and <br /> prepare necessary change orders in triplicate originals for the City's approval and <br /> execution in accordance with the construction contract documents. Engineer will not issue <br /> change orders not previously approved in writing by City, and no course of conduct on the <br /> - part of Engineer or City will amend, waive or alter this provision. <br /> 1.3.13 Conduct professional inspections to determine the dates of substantial completion <br /> and final completion for the Project, to evaluate the work for acceptable conformance with <br /> the construction contract documents and in light of any subsequent tests performed as <br /> described in Subsection 1.3.9, to verify that any minor deviations from the construction <br /> contract documents as described in Subsection 1.3.9 have been corrected and thatthe <br /> reasons for any specific qualifications in any and all previous certificates for payment as <br /> described in Subsection 1.3.9 hereof are either no longer valid or the condition(s) and/or <br /> problem(s) have been corrected; shall receive and review written warranties and related <br /> documents required by the construction contract documents and assembled by the <br /> Contractor; will issue final certificates for payment or take other appropriate action; and will <br /> make a written recommendation to the City regarding City's acceptance of the Project. <br /> < <br /> 1.3.14 Prepare, or cause to be prepared, and submit to the City a set of reproducible <br /> record drawings showing significant changes in the work made during the construction <br /> phase. <br /> 1.3.15 Post all notices required and provided by the City in the appropriate locations at the <br /> Project site. <br /> 1.3.16 Prior to the end of the one year warranty period, review the completed Project with <br /> the City and the Contractor and have all deficient items corrected. The Engineer will also <br /> - ensure that nominal amounts of replacement materials for maintenance purposes are <br /> furnished to the City by the Contractor. The extent of the duties, responsibilities and <br /> limitations of authority of the Engineer as the City's representative during construction will <br /> not be modified or extended after the construction contract documents have been <br /> authorized by the City to be competitively bid without written consent of the City and the <br /> Engineer and with notice to the Contractor. <br /> 1.4 ADDITIONAL SERVICES <br /> 1.4.1 Since the Engineer's compensation is a fixed fee for Basic Services, including minor <br /> deviations from those described in this Agreement, compensation to the Engineer for <br /> additional services will only be for substantial deviations from the scope of services <br /> described in this Agreement. <br />