Laserfiche WebLink
<br /> I If) F <br /> issue change orders not previously approved in writing by CITY, and no course of conduct <br /> on the part of ARCHITECT or CITY will amend, waive or alter this provision. <br /> 1.4.13 Conduct professional inspections to determine the dates of substantial completion <br /> and final completion for the Project, to evaluate the work for acceptable conformance with <br /> the construction contract documents and in light of any subsequent tests performed as <br /> described in Subsection 1.4.9, to verify that any minor deviations from the construction <br /> contract documents as described in Subsection 1.4.9 have been corrected and that the <br /> reasons for any specific qualifications in any and all previous certificates for payment as <br /> described in Subsection 1.4.9 hereof are either no longer valid or the condition(s) and/or <br /> problem(s) have been corrected; shall receive and review written warranties and related <br /> documents required by the construction contract documents and assembled by the <br /> Contractor; will issue final certificates for payment or take other appropriate action; and will <br /> make a written recommendation to the CITY regarding CITY's acceptance of the Project. <br /> 1.4.14 Require the submission by the Contractor, and subcontractors performing work on <br /> the Project site, of periodic wage rate payment reports and, with the CITY's assistance, <br /> verify compliance with federal and state wage rate requirements for the Project; and notice <br /> the CITY of any noncompliance, or of the failure by the Contractor or subcontractor's to <br /> make submissions. <br /> 1.4.15 Prepare, or cause to be prepared, and submit to the CITY a set of reproducible <br /> record drawings showing significant changes in the work made during the construction <br /> phase. <br /> 1.4.16 Ensure that all notices and signs required and provided by HUD are posted in the <br /> appropriate locations at the Project site. <br /> 1.4.17 Prior to the end of the one year warranty period, review the completed Project with <br /> the CITY and the Contractor and have all deficient items corrected. The ARCHITECT will <br /> also ensure that nominal amounts of replacement materials for maintenance purposes are <br /> furnished to the CITY by the Contractor. The extent of the duties, responsibilities and <br /> limitations of authority of the ARCHITECT as the CITY's representative during construction <br /> will not be modified or extended after the construction contract documents have been <br /> authorized by the CITY to be competitively bid without written consent of the CITY and the <br /> ARCHITECT and with notice to the Contractor. <br /> 1.5 ADDITIONAL SERVICES <br /> 1.5.1 Since the ARCHITECT's compensation is a fixed fee for Basic Services, including <br /> minor deviations from those described in this Agreement, compensation to the <br /> ARCHITECT for additional services will only be for substantial deviations from the scope <br /> of services described in this Agreement. <br /> 1.5.2 Additional services will be provided by ARCHITECT if authorized by the CITY on the <br /> 7 <br />