Laserfiche WebLink
<br /> , b:JO <br /> .. . - <br /> EXHIBIT A - Page 2 of 4 <br /> Construction: 3/23/95 <br /> 8" PVC Waste Water Collection Line 4675 linear feet <br /> Standard manholes 13 each <br /> Flood Proof Manholes 4 each <br /> Drop Manholes 2 each <br /> Cleanouts 1 each <br /> Boring 60 linear feet <br /> Road and Drainage Repair 320 square yards <br /> Although there are water and gas lines along F.M. 2439, they pose <br /> no particular problem for the proposed project. <br /> There is no reliable was to estimate the cost of easement <br /> acquisition. The estimated cost for soil testing, topographic <br /> surveying, easement surveying and engineering services is <br /> $38,000.00. <br /> The unit prlce for the 8" PVC were adjusted to reflect 50% of the <br /> line being in rock. The estimated construction cost including 20% <br /> contingency is $199,312.20. The detailed construction cost <br /> breakdown is attached to this report. <br /> The total project cost, excluding easement acquisition costs, is <br /> estimated to be $237,312.20. <br /> . <br /> å\Jffi~ <br /> </"2]/9 ! <br /> Byrn & Associates, Inc. 512-396-2270 2 P.o. Box 1433 San Marcos, Texas 78667 <br />