Laserfiche WebLink
<br /> >, ' 52 <br /> This AGREEMENT is made this the 23rd day of May , <br /> 1995, between the CITY OF SAN MARCOS, TEXAS (the "CITY"), 630 East <br /> Hopkins, San Marcos I Texas 78666, and BYRN & ASSOCIATES, INC., 1115 <br /> Highway 80 East, San Marcos, Texas 78666, hereinafter referred to as <br /> "ENGINEER", for services in connection with the Hunter/Hofheinz <br /> Wastewater Line Extension Project in San Marcos, Texas. <br /> WITNESSETH: CITY and ENGINEER do hereby agree as follows: <br /> ARTICLE 1 <br /> - ENGINEER'S SERVICES AND RESPONSIBILITIES <br /> l 1.0 STANDARDS OF PERFORMANCE, QUALITY CONTROL AND SCHEDULING <br /> 1. 0.1 ENGINEER will be responsible for the performance of <br /> topographic and easement surveys for easement acquisition, the proper I <br /> accurate and the adequate design and preparation of plans and <br /> specifications necessary for the Project, bidding, and construction <br /> administration for the extension of a wastewater line along Hofheinz <br /> Street and Hunter Road approximately as illustrated in that report <br /> dated March 23, 1995 prepared by ENGINEER and attached hereto as <br /> Exhibit A, hereinafter referred to as the "Project". ENGINEER will <br /> also assist the CITY with its easement acquisition process as directed <br /> by the CITY. <br /> 1. 0.2 Any provisions in this Agreement pertaining to CITY's review, <br /> approval and/or acceptance of plans, specifications, construction <br /> contract documents, or other written materials prepared by ENGINEER <br /> and/or its Consultants, Contractors, and Subcontractors in connection <br /> with this Project will not diminish ENGINEER's responsibility therefor. <br /> The ENGINEER's Basic Services will consist of the tasks described in <br /> Paragraphs 1.0 through 1.6 and includes normal civil engineering <br /> services, topographic and easement surveying and assistance with <br /> easement acquisition. <br /> 1. 0.3 In the performance of all professional services in connection <br /> I with this Agreement I the ENGINEER will use that degree of care and <br /> I skill ordinarily exercised for similar projects by professional <br /> engineers who possess special expertise in the type of work involved in <br /> this Project. <br /> 1.0.4 The CITY will designate a Project Manager and the ENGINEER <br /> will designate a Project Representative. The ENGINEER will prepare a <br /> detailed schedule of its work for the Project addressing each component <br /> of the work to be done. <br /> 1.1. PHASE 1 - TOPOGRAPHIC SURVEYS <br /> The ENGINEER will: <br /> 1.1.1. Conduct topographic surveys based upon the route selected in <br /> subsection 1.3.1. Additional topographic surveys will be <br /> performed if conditiol1.s require that the route be changed. <br /> Any additional surveys required after final design has begun <br /> will be considered additional services under Section 1.7. <br />