My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4
San-Marcos
>
City Clerk
>
03 Resolutions
>
2000 s
>
2009
>
4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2015 8:19:12 AM
Creation date
11/28/2012 2:38:14 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ATTACHMENT "A" <br />CHAPTER 715 - WATER AND WASTEWATER AVAILABILITY <br />Sub - Chapter 3 - Water Availability <br />§3.01. Applicability <br />The following developments are exempted from the requirements to certify water availability <br />under these Regulations. The County encourages exempted developments to comply with these <br />Regulations. <br />(A) Exempted subdivisions as defined under §701.3.01. <br />(B) Exempted Manufactured Home Rental Communities as defined under §745.2.01. <br />(C) The following categories of non - exempt subdivisions are not required to demonstrate <br />water availability, subject to the inclusion of a plat note prohibiting further non - exempt <br />subdivision or re- subdivision for a period of five (5) years following the filing of the <br />Final Plat: <br />(1) All non - exempt subdivisions of five (5) lots or less in which all lots average at least two <br />(2) acres. <br />(2) All subdivisions of ten (10) lots or less in which all lots are larger than ten (10) acres. <br />§3.02. Items Common to All Water Availability Demonstrations <br />The following items shall be addressed in all water availability demonstrations prepared under <br />these regulations, regardless of the source(s) utilized: <br />(A) An estimate of the amount of water demand throughout all phases of development <br />supported by engineering calculations based on the anticipated timetable for full build - <br />out, including a statement describing the level of fire protection afforded to the proposed <br />phase(s) of the development; <br />(B) A statement as to whether there are plans for alternative or backup water service; if so, an <br />identification of the alternative or backup water source; <br />(C) A description of any anticipated new water facility improvements required to serve the <br />development; <br />(D) A map showing the proposed location of all water facilities throughout all phases of <br />development as well as the proposed water service area, including any TCEQ- approved <br />service area boundaries of a water service provider operating under a Certificate of <br />Convenience and Necessity (CCN) within the boundaries of the proposed subdivision; <br />(E) An estimated timetable for completion of all facilities; and, <br />(F) Based on the information available at the time the application is submitted, the <br />anticipated owner(s) and operator(s) of all water facilities throughout all phases of <br />development shall be identified and included in the application. <br />§3.03. Notification for All Developments Utilizing Local Groundwater <br />This Subchapter addresses the requirements that Subdivisions and Manufactured Home Rental <br />Communities must meet to demonstrate water availability using Local Groundwater for the <br />purposes of obtaining a Development Authorization from the County. These Regulations do not <br />
The URL can be used to link to this page
Your browser does not support the video tag.