Laserfiche WebLink
<br /> 9/1J- <br /> specified, selected or specially provided for by the ARCHITECT, except that used materials <br /> and equipment will be included as if purchased new for the Project. <br /> 3.1.3 Construction cost does not include the compensation of the ARCHITECT and the <br /> ARCHITECT's consultants, or other costs which are the responsibility of the CITY as <br /> provided in Article 2. <br /> 3.2 RESPONSIBILITY FOR CONSTRUCTION COST <br /> 3.2.1 Evaluations of the CITY's Project budget and detailed cost estimates, if any, <br /> prepared by the ARCHITECT, will represent the ARCHITECT's best judgment as a design <br /> professional familiar with the construction industry. <br /> 3.2.2 A fixed limit of construction cost for this Project will be established by the CITY's <br /> representative after consulting with the ARCHITECT. The ARCHITECT will be permitted <br /> to include contingencies for design, bidding and price escalation, to determine what <br /> materials, equipment, component systems and types of construction are to be included in <br /> the construction contract documents, to make reasonable adjustments in the scope of the <br /> Project and to include in the construction contract documents alternate bids to adjust the <br /> construction cost to the fixed limit. The fixed limit of construction cost may be increased <br /> by the CITY. ~ <br /> 3.2.3 If the lowest bona fide bid exceeds the ARCHITECT's most recent approved cost <br /> estimate established as a condition of this Agreement, the City will (1) give written approval <br /> of an increase in such fixed limit, (2) authorize rebidding of the Project within a reasonable <br /> time, or (3) cooperate in revising the Project scope and quality to reduce the construction <br /> cost. During the development of the Project through the phases described by Article 1 of <br /> this Agreement and prior to the CITY's final approval of construction contract documents, <br /> the ARCHITECT will monitor the established probable construction cost in relation to the <br /> established fixed limit. <br /> If necessary, the ARCHITECT will implement construction cost savings measures <br /> or otherwise endeavor to limit probable construction cost to the level of available funds set <br /> by the CITY. <br /> ARTICLE 4 <br /> REIMBURSABLE EXPENSES. <br /> 4.1 Reimbursable expenses are to be charged to the CITY by the ARCHITECT at actual <br /> cost and include such things as expenses for plotting and reproduction of documents, auto <br /> travel mileage, delivery charges, long distance communications and freight. <br /> ARTICLE 5 <br /> PAYMENTS TO THE ARCHITECT <br />