Laserfiche WebLink
<br /> q¡f- <br /> construction contract documents, whether or not such work is then fabricated, installed or <br /> completed. The ARCHITECT will review the work and results of all testing laboratories as <br /> required by the construction contract documents. <br /> 1.4.10 Review and make all decisions regarding the approval or taking of other appropriate <br /> action upon the Contractor's submittals, including but not limited to, shop drawings, product <br /> data and samples, schedule of values and progress schedule. Such action ,will be taken <br /> with reasonable promptness, but generally not to exceed 15 days or such period of time <br /> as will not cause delay of the Project. <br /> 1.4.11 Prepare minor changes in the plans and specifications as directed by the CITY; and <br /> prepare any necessary change orders in triplicate originals for approval by TDHCA prior <br /> to the CITY's approval and execution in accordance with the construction contract <br /> documents. ARCHITECT will not issue change orders not previously approved in writing <br /> by CITY, and no course of conduct on the part of ARCHITECT or CITY will amend, waive <br /> or alter this provision. <br /> 1.4.12 Conduct professional inspections to determine the dates of substantial completion <br /> and final completion for the Project, to evaluate the work for acceptable conformance with <br /> the construction contract documents and in light of any subsequent tests performed as <br /> described in Subsection 1.4.8, to verify that any minor deviations from the construction <br /> contract documents as described in Subsection 1.4.8 have been corrected and that the <br /> reasons for any specific qualifications in any and all previous certificates for payment as <br /> described in Subsection 1.4.8 hereof are either no longer valid or the condition(s) and/or <br /> problem(s) have been corrected; shall receive and review written warranties and related <br /> documents required by the construction contract documents and assembled by the <br /> Contractor; will issue final certificates for payment or take other appropriate action; and will <br /> make a written recommendation to the CITY regarding CITY's acceptance of the Project. <br /> 1.4.13 Require the submissiOn by the Contractor, and subcontractors performing work on <br /> the Project site, of periodic wage rate payment reports and, with the CITY's assistance, <br /> verify compliance with federal and state wage rate requirements for the Project; and notify <br /> the CITY of any noncompliance, or of the failure by the Contractor or subcontractors to <br /> make submissions. <br /> 1.4.14 Prepare, or cause to be prepared, and submit to the CITY a set of reproducible <br /> record drawings showing significant changes in the work made during the construction <br /> phase. <br /> 1.4.15 Post all notices required and provided by TDHCA in the appropriate locations at the <br /> Project site. <br /> 1.4.16 Prior to the end of the one year warranty period, review the completed Project with <br /> the CITY and the Contractor and have all deficient items corrected. The ARCHITECT will <br /> also ensure that nominal amounts of replacement materials for maintenance purposes are <br />