My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1995-164
San-Marcos
>
City Clerk
>
03 Resolutions
>
1990 s
>
1995
>
Res 1995-164
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2007 4:35:48 PM
Creation date
6/26/2007 4:35:48 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
1995-164
Date
9/11/1995
Volume Book
120
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> /(,£ <br /> 1.4.12 Conduct professional inspections to determine the dates of substantial completion <br /> and final completion for the Project, to evaluate the work for acceptable conformance with <br /> the construction contract documents and in light of any subsequent tests performed as <br /> described in Subsection 1.4.8, to verify that any minor deviations from the construction <br /> contract documents as described in Subsection 1.4.8 have been corrected and that the <br /> reasons for any specific qualifications in any and all previous certificates for payment as <br /> described in Subsection 1.4.8 hereof are either no longer valid or the condition(s) and/or <br /> problem(s) have been corrected; shall receive and review written warranties and related <br /> documents required by the construction contract documents and assembled by the <br /> Contractor; will issue final certificates for payment or take other appropriate action; and will <br /> make a written recommendation to the CITY regarding CITY's acceptance of the Project. <br /> 1.4.13 Require the submission by the Contractor, and subcontractors performing work on <br /> the Project site, of periodic wage rate payment reports and, with the CITY's assistance, <br /> verify compliance with federal and state wage rate requirements for the Project; and notify <br /> the CITY of any noncompliance, or of the failure by the Contractor or subcontractor's to <br /> make submissions. <br /> 1.4.14 Prepare, or cause to be prepared, and submit to the CITY a set of reproducible <br /> record drawings showing significant changes in the work made during the construction <br /> phase. <br /> . <br /> 1.4.15 Conduct material testing (i.e. concrete) as may be required by CITY at no additional <br /> cost. <br /> 1.4.16 Post all notices required and provided by TDHCA in the appropriate locations at the <br /> Project site. <br /> 1.4.17 Prior to the end of the one year warranty period, review the completed Project with <br /> the CITY and the Contractor and have all deficient items corrected. The ENGINEER will <br /> also ensure that nominal amounts of replacement materials for maintenance purposes are <br /> furnished to the CITY by the Contractor. The extent of the duties, responsibilities and <br /> limitations of authority of the ENGINEER as the CITY's representative during construction <br /> will not be modified or extended after the construction contract documents have been <br /> authorized by the CITY to be competitively bid without written consent of the CITY and the <br /> ENGINEER and with notice to the Contractor. <br /> 1.5 ADDITIONAL SERVICES <br /> 1.5.1 Since the ENGINEER's compensation is a fixed fee for Basic Services, including <br /> minor deviations from those described in this Agreement, compensation to the ENGINEER <br /> for additional services will only be for substantial deviations from the scope of services <br /> described in this Agreement. <br /> 1.5.2 Additional services will be provided by ENGINEER if authorized or confirmed in <br />
The URL can be used to link to this page
Your browser does not support the video tag.