Laserfiche WebLink
<br /> I ( ç?- <br /> 2.9 The CITY will either direct the ENGINEER to perform any additional services <br /> necessary to complete the Project or will furnish those services itself. <br /> 2.10 The CITY will pay all fees for filing and processing permits in connection with the <br /> Project and for the submission of plans and specifications to the State Department of <br /> Licensing and Regulation. <br /> 2.11 The CITY will bear all costs incident to this Article. <br /> 2.12 The CITY will issue written notices authorizing the ENGINEERto proceed with the <br /> work specified in each of the phases included in this Agreement. <br /> 2.13 The CITY will provide its standard construction contract documents, which do not <br /> include plans or technical specifications, to the ENGINEER prior to commencement of the <br /> design development phase, Subsection 1.3.1. <br /> 2.14 In the event that the CITY requires resident inspection services to be performed on <br /> the Project, the City will provide building space suitable for use as an office, the storage <br /> of records, drawings, files, samples, Contractor submittals and other work related material <br /> until 30 days following completion of the Project. The space will be air conditioned and will <br /> be in proximity to the Project location. <br /> . <br /> ARTICLE 3 <br /> CONSTRUCTION COST <br /> 3.1 DEFINITION <br /> 3.1.1 The construction cost will be the total cost or estimated cost to the CITY of all <br /> elements of the Project designed or specified by the ENGINEER. <br /> 3.1.2 The construction cost will include at current market rates, including a reasonable <br /> allowance for overhead and profit, the cost of any equipment which has been designed, <br /> specified, selected or specially provided for by the ENGINEER, except that used materials <br /> and equipment will be included as if purchased new for the Project. <br /> 3.1.3 Construction cost does not include the compensation of the ENGINEER and the <br /> ENGINEER's consultants, or other costs which are the responsibility of the CITY as <br /> provided in Article 2. <br /> 3.2 RESPONSIBILITY FOR CONSTRUCTION COST <br /> 3.2.1 Evaluations of the CITY's Project budget and detailed cost estimates, if any, <br /> prepared by the ENGINEER, will represent the ENGINEER's best judgment as a design <br /> professional familiar with the construction industry. <br />