My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1995-223
San-Marcos
>
City Clerk
>
03 Resolutions
>
1990 s
>
1995
>
Res 1995-223
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2007 8:26:09 AM
Creation date
6/28/2007 8:26:09 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
1995-223
Date
12/11/1995
Volume Book
121
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> 130{< <br /> EXHIBIT A <br /> DESCRIPTION OF PROJECT. CONTRACT AND SCHEDULE <br /> <br /> This project consists of the establishment and implementation of a Construction <br /> Management Program to implement the City of San Marcos' Wastewater Capital <br /> Improvements Program. The Cii:y' s Wastewater Capital Improvements Program <br /> includes upgrading and expansion of the existing wastewater treatment plant, <br /> implementation of a pilot scale biosolids beneficial reuse program, and <br /> prioritized rehabilitation of the wastewater collection system. The design and <br /> construction of the improvements are to be performed by others under the program <br /> administered by the Construction Manager. <br /> This contract consists of the services required to administer the Construction <br /> Management program. The scope of services are presented as basic services and <br /> additional services. The basic services cover the elements of the program that <br /> are required for the program and authorized by the execution of the contract. <br /> The additional services are the work elements that could be required and are <br /> identified in the contract but are not authorized until the Construction Manager <br /> is given additional written approval by the City. <br /> The schedule is strongly driven by the new effluent diScharge)þermit requirement <br /> that the effluent quality meet 5/5/2/1/6.0 for BODs/TSS/NH3-N /00 by January 1, <br /> 1998. It also is a function of the design and construction activities of the <br /> selected design consultants and contractors for all elements of the City of San <br /> Marcos' Wastewater Capital Improvements Program. <br /> The overall project shall consist of the following tasks: <br /> BASIC SERVICES <br /> 1.00 Project Management <br /> 1.01 Conduct Management Workshops <br /> 1.02 Program Management Plan <br /> 1.03 Program Procedures Manual <br /> 1.04 Design Standards Manual <br /> 1.05 Management Information System <br /> 1.06 Implement and Conduct Construction Project Partnering Programs <br /> 1.07 Cost Estimating / Cost Control <br /> 1.08 Scheduling <br /> 2.00 Technical Review and Consultation <br /> 3.00 Assistance with State Revolving Loan Fund Program <br /> 3.01 Assistance with Regulatory Agencies <br /> 3.02 Environmental Assessment <br /> R:\CSBD\SMllC,DOC <br /> Exhi bit A-I <br />
The URL can be used to link to this page
Your browser does not support the video tag.