Laserfiche WebLink
<br /> 13ol- <br /> 3.03 Water Conservation and Drought Contingency Plan <br /> 3.04 NPDES Application for City of San Marcos Wastewater Utility Improvements <br /> 3.05 Assistance with Public Participation <br /> 4.00 Design Phase Review Services <br /> 4.01 Value Engineering Studies <br /> 4.02 Constructability Reviews <br /> 4.03 Preparation of Construction Contract Documents. <br /> 5.00 Construction Phase Services <br /> 5.01 Assistance with Contractor Selection <br /> 5.02 Construction Contract Administration <br /> 5.03 Claims Management <br /> 6.00 Post Construction Services <br /> 6.01 Operations and Maintenance Manual Update <br /> 6.02 Start-up and Operation Assistance <br /> 6.03 Project Performance Report <br /> ADDITIONAL SERVICES <br /> 1.00 Permitting Assistance <br /> 2.00 Water Quality Modeling <br /> 3.00 Public Input/Outreach Program . <br /> 4.00 Regulatory Agency liaison <br /> 5.00 Long Term Flow Monitoring Standards <br /> 6.00 Additional Technical Consultation and Design Services <br /> 7.00 GIS Mapping Assistance <br /> 8.00 Geo-technical Investigations and Materials Testing <br /> A detailed description of each task is included under Exhi bit B Scope of <br /> Engineering Services. <br /> R:\CSBO\SMIIC.OOC <br /> Ex hi b it A - 2 <br />