<br /> . 13l>t..- <br /> inspections and final payment inspections, <br /> 2.16 Notify the CONSTRUCTION MANAGER of any developments that affect the scope <br /> or timing of CONSTRUCTION MANAGER's services, and notify the CONSTRUCTION <br /> MANAGER of defects or non-conformance of the work of a Construction Contractor, <br /> 2.17 Coordinate with the CONSTRUCTION MANAGER to ensure that all, agreements <br /> between the CITY and the Design Consultants and the Construction Contractors are <br /> compatible and consistent with this Agreement. CONSTRUCTION MANAGER will be <br /> listed as an additional insured in all construction contracts, <br /> 2.18 Officially adopt the Water Conservation and Drought Contingency Plan prepared by <br /> the CONSTRUCTION MANAGER, if necessary for Texas Water Development Board loan <br /> program, <br /> 2.19 Be responsible for hazardous and radioactive materials such as asbestos, PCBs, <br /> and petroleum present at the site of each Construction Project before the project at each <br /> site begins, or introduced to the site by the CITY after that time. <br /> ARTICLE 3 <br /> CONSTRUCTION COST <br /> . <br /> 3.1 DEFINITION <br /> 3.1.1 The construction cost for each Construction Project will be the total cost or <br /> estimated cost to the CITY of all elements of the Construction Project designed or specified <br /> by the Design Consultant. <br /> 3.1.2 The construction cost will include at current market rates, including a reasonable <br /> allowance for overhead and profit, the cost of any equipment which has been designed, <br /> specified, selected or specially provided for by the Design Consultant, except that used <br /> materials and equipment will be included as if purchased new for the Construction Project. <br /> 3,1,3 Construction cost does not include the compensation of the CONSTRUCTION <br /> MANAGER and the Design Consultant, or other costs which are the responsibility of the <br /> CITY as provided in Article 2, <br /> 3.2 RESPONSIBILITY FOR CONSTRUCTION COST <br /> 3.2,1 Evaluations of the CITY's budget and detailed cost estimates, prepared by the <br /> CONSTRUCTION MANAGER will represent the CONSTRUCTION MANAGER's best <br /> judgment as a design professional familiar with the construction industry. <br /> 3,2,2 A fixed limit of construction cost for each Construction Project will be established by <br /> the CITY's representative after consulting with the CONSTRUCTION MANAGER. The <br />