Laserfiche WebLink
<br /> . ' be lo1A- <br /> 1.0.7 Improvements for which professional services will <br /> furnished under this Agreement will be limited to the following items <br /> unless otherwise expanded under the terms of this Agreement: <br /> PART A- Taxiway Lighting, Signage and Electrical Controls <br /> Installation <br /> PART B- Municipal Airport Access <br /> Road Construction <br /> PART C- Environmental Assessment- <br /> Extension of Runway 12-30 <br /> 1.0.8 The CONSULTANT will render services necessary for development <br /> of Parts A and B of the Proj ect separately in three phases each as <br /> follows: <br /> PHASE l- preliminary design, preparation of cost estimates, <br /> and coordination with the FAA. <br /> PHASE 2- Final design and preparation of detailed <br /> construction drawings and specifications. <br /> PHASE 3- .General administration of construction, and <br /> resident construction inspection. <br /> 1.1 PART A AND PART B - PHASE 1- PRELIMINARY DESIGN <br /> The CONSULTANT will: <br /> . <br /> 1.1.1 Attend conferences with the CITY and other interested parties <br /> regarding the Project and prepare and distribute copies of conference <br /> and meeting records to the CITY and the FAA. <br /> 1.1.2 For Part A: <br /> (a) Preliminary Enqineerinq Report- Utilizing the latest airport <br /> layout plan, establish the design criteria for the taxiway <br /> lighting system, taxiway guidance signage system and <br /> electrical vault control equipment, develop preliminary cost <br /> estimates based upon the project scope, define any additional <br /> requirements which would require FAA and City approval, and <br /> obtain approval of the preliminary engineering report by FAA <br /> and the City prior to startup of preliminary design. Due to <br /> the short time frame, a personal visit to FAA for immediate <br /> review and approval will be required. <br /> (b) Preliminary Desiqn- prepare preliminary drawings defining the <br /> new taxiway lighting and taxiway signage system layout for <br /> Taxiways "A", "B", "C", "D", "E", II F", Apron Taxilane and the <br /> lighting control equipment. Develop preliminary <br /> specifications and refine the cost estimates, submit the <br /> preliminary design documents to the FAA and City and obtain <br /> approval from FAA and the City prior to startup of final <br /> design. Due to the short time frame, a personal visit.to FAA <br /> for immediate review and approval will be required. <br /> -2- <br /> I <br /> I <br />