Laserfiche WebLink
<br /> 100£ <br /> San Marcos FY 95 Estim.ated Construction Quantities <br /> Project No 94-8453-01 U FAA Pre-App <br /> Item Description Unit 1 Unit 2 Unit 3 Unit 4 Unit 5 <br /> 1 Milling SY 249.2 555.6 638.9 686.7 555.6 <br /> 2 Bonded Overlay SY 249.2 555.6 638.9 666.7 555.6 <br /> 3 Random Crack Repair LF 351 339 207 232 311 <br /> 4 Random Spall Repair SF 986 559 373 683 598 <br /> 5 Remove 6" Concrete Slab SY '0.0 0.0 0.0 . 0.0 0.0 <br /> 6 4" Aggregate Base Course CY 0.0 0.0 0.0 0.0 0.0 <br /> 7 Replace 6" Concrete Slab SY 0.0 0.0 0.0 0.0 0.0 <br /> 8 Typical Joint Repair LF 11,765 5,525 5,525 5,525 5,525 <br /> Unit 6 Unit 7 Unit 8 Unit 9 Unit 10 <br /> 1 Milling SY 555.6 805.6 583.3 805.6 '722.2 <br /> 2 Bonded Overlay SY 555.6 805.6 583.3 ' 805.6 722.2 <br /> 3 Random Crack Repair LF 198 335 226 190 149 <br /> 4 Random Spall Repair SF 779 536 367 260 190 <br /> 5 Remove 6" Concrete Slab SY 83.3 194.4 138.9 138.9 111.1 <br /> 6 4" Aggregate Base Course CY 9.3 21.6 15.4 15.4 12.3 <br /> 7 Replace 6" Concrete Slab SY 83.3 194.4 138.9 138.9 111.1 <br /> 8 Typical Joint Repair LF 5,525 5,525 5,525 5,525 5,525 <br /> Unit 11 Unit 12 Unit 13 Unit 14 Unit 15 <br /> 1 Milling SY 694.4 333.3 1,000.0 1,083.3 1,027.8 <br /> 2 Bonded Overlay SY 694.4 333.3 1,000.0 1,083.3 1,027.8 <br /> 3 Random Crack Repair LF 374 304 171 117 148 <br /> 4 Random Spall Repair SF 354 1,192 531 553 626 <br /> 5 Remove 6" Concrete Slab SY 138.9 83.3 138.9 138.9 138.9 <br /> 6 4" Aggregate Base Course CY 15.4 9.3 15.4 15.4 15.4 <br /> 7 Replace 6" Concrete Slab SY 138.9 83.3 138.9 138.9 138.9 <br /> 8 Typical Joint Repair LF 5,525 5,525 5,525 5,525' 5,525 <br /> <br /> Carter + Burgess, Austin PREAPQTY.XlS <br /> Franklin Hines, P.E. lO:42AM:8116/9.4 <br />