My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1993-082
San-Marcos
>
City Clerk
>
03 Resolutions
>
1990 s
>
1993
>
Res 1993-082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2007 4:37:54 PM
Creation date
7/2/2007 4:37:54 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Contract
Number
1993-82
Date
4/26/1993
Volume Book
110
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> /D5""H <br /> RFP 93-021 <br /> equipment shall be installed so as to provide reasonable safety to <br /> the operator. <br /> 3.7 Route cables and wiring within equipment racks and cabinetry <br /> according to function, separating wires of different signal levels <br /> (line level, amplifier output, AC, etc.) by as much physical <br /> distance as is possible. <br /> 3.8 Neatly arrange and bundle all cable loosely with plastic cable <br /> ties. <br /> 3.9 Provide all audio circuits balanced and floating. <br /> 3.10 Cables and wires are to be continuous lengths without <br /> splices. <br /> 3.11 In each and every case, cables and wires shall be terminated <br /> with the proper connector required for the associated operation of <br /> the equipment it is connected to. No cable is to be connected to a <br /> piece of equipment without the proper connector. <br /> 3.12 Furnish all accessory items necessary to integrate each piece <br /> of equipment into the system including rackmounts, other mounting <br /> devices, special connectors and interfaces. <br /> ~ <br /> 3.13 Any additional wiring, conduit, power, modifications to the <br /> building or other changes from the existing conditions, either <br /> called out herein or found to be necessary to implement this <br /> design, are the responsibility of the successful proponent and the <br /> cost of those modifications will be borne solely by the successful <br /> proponent. <br /> A. Any modifications or additions to the building or it <br /> systems, necessary for the implementation and execution <br /> of this contract shall be approved prior to commencement <br /> of the work. . <br /> B. Holes shall be drilled cleanly and acrylic caulk used to <br /> completely fill any voids created. <br /> 3.14 Terminate all unused inputs with proper shielded resistors.. <br /> 3.15 Label all wires and cables in racks and consoles as to <br /> destination and purpose. Labeling shall not be handwritten and be <br /> permanently attached with a clear wrap guard. <br /> 3.16 Unless illness, loss of personnel, or other circumstances <br /> beyond the control of the successful proponent intervener he shall <br /> keep the same individual in charge through-out its execution. À <br /> qualified engineer shall exercise engineering supervision over the <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.