Laserfiche WebLink
<br /> l 57/1G- <br /> SAN MARCOS ELECTRIC UTILITY <br /> ELECTRIC RATE SCHEDULES <br /> MISCELLANEOUS SERVICE CHARGES <br /> Rate Schedule - MSC <br /> Effective: June 1, 1993 Page 3 <br /> <br /> THEFT OF SERVICE <br /> At a minimum, the above stated charge will be made for any incidence of tampering with the <br /> City's metering installation, interference with the proper working thereof, any theft of service <br /> by any person on customer's premises, or evidence of such tampering, interfering, or theft <br /> (energy diversion). The minimum charge shall be imposed for the detection and confirmation of <br /> energy diversion. In addition, the customer shall pay the reconnect charge, the expenses of <br /> any damage to or replacement of the City's equipment and the estimated cost of electric power <br /> and energy not recorded by the City's meters by reason of energy diversion, at the applicable <br /> rate based on the City's best estimated data. <br /> RETURNED CHECK OR BANK DRAFT CHARGE <br /> This charge will be made for each check or bank draft returned without payment because of <br /> insufficient funds, account closed or no account. <br /> . <br /> REQUESTED METER TEST CHARGE <br /> This charge will apply when a meter test is made at the customer's request, the meter been <br /> tested at the customer's request within the previous twenty four (24) months, and the meter is <br /> found to be within the accuracy standards established by the American National Standard <br /> Institute. <br /> , <br />